Lewisham · SE6

Worktop replacement in Catford

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Catford kitchens

The kitchens we meet in Catford

Nine times out of ten the replacements in Catford that go smoothly are the ones where somebody asked awkward questions about the room at the start. Edwardian terraces behind the Broadway with back-addition kitchens, plus a lot of purpose-built and converted flats where the kitchen is a single 2.4m to 3m run against one wall. Rear extensions are common on the terraces to the south and east. Whatever is behind the doors, the sequence does not change: look, measure, draw, agree, cut, fit.

Original quarry tile is often still down under two or three later floor coverings, which is why the finished floor height is rarely what anyone expects. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A single day, planned properly.

Where the kitchen has taken the bay, the end of the room is three facets of glass set at angles and there is no straight wall left to finish against. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Plaster comes away with the old upstands more often than not.

The houses and blocks behind these jobs are Victorian terrace, Edwardian terrace, 1960s council block and 1930s mansion flats. The run length that is easy in one is a join in another.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • Edwardian terrace
  • 1960s council block
  • 1930s mansion flats

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • New stone is fitted five to ten working days after the measure.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
  • Old tops come out in the morning, new stone is down and sealed the same day.
Borough
Lewisham
Postcodes
SE6
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Catford is its own job

Working in Catford regularly means we plan for what catches people out here rather than finding it on the day. A one-way system and two stations funnel traffic tightly through the centre with loading restrictions on the main roads; the residential streets are permit-parked and narrow. Flats over the shops around the Broadway almost always mean a stair carry and a jointed run, price that in rather than discovering it on the day. None of that changes the price once the template is done. The number we agree at the template is the number you pay.

The work

What worktop replacement involves

A replacement is quoted the same way as a new kitchen: material per square metre supply-only, with templating, fabrication and fitting each written on their own line. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Replacement sometimes runs in the reverse order to a new fit, because the old top has to come off before what is under it can be templated. Tiles bedded on the old top tend to come away with it, so the bottom two courses are taken off deliberately rather than left to break. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. Sink and hob settled before the templater attends.

Waterfall ends See the options

The money

What it costs in Catford

What the old worktop was fixed to matters more to the price than what goes on top of it. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Across the catalogue the supply-only rate is £110 to £550 per square metre, before any of the work that turns a slab into a worktop. You keep the units, and you see what that saves.

Victorian and Edwardian terraces

What Catford asks for

Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. Several flats can be done on consecutive days, with one kitchen out of use at a time. Cam-lock carcasses get braced before stone lands.

More of our week goes on this than on worktop installation put together.

Victorian and Edwardian terraces

Catford in the housing figures

In the streets around Catford, the council tax banding sits at the bottom of the London range. The plans vary house by house. A heavier surface may need the cabinets braced, which is settled once the old laminate is lifted. Disposal is a line on the quote, not a surprise.

Access

Getting stone into a Catford kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Catford is covered on our south east London run, along with the rest of Lewisham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Catford

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Catford, or just list it?

Yes. Catford is on the patch, and the postcodes we work here are SE6. It is worked on our south east London run, along with the rest of Lewisham. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old tops out and new stone in, both through the same gap. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What should I expect from worktop replacement in a Catford kitchen?

Cornice runs round the head of the wall, so the wall units stop under it and the splashback band is trapped between two things that are not going to move. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. The building has kept moving; the new template catches up. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. A postformed top swallowed the fall. This will not.

03

How would you get a worktop into a property in Catford?

A short run of external steps before the communal door means a piece is lifted twice before the staircase proper has even started. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Waste goes out the way the stone came in, so the route stays clear. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The waste run is planned, not improvised.

04

Do you end up doing worktop replacement more than the rest in Catford?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Housings set out for laminate are checked first. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. The carcasses have to be sound, because stone is several times the weight of what is coming off. A builder-finish kitchen upgrades in a morning.

05

What moves the number on a quote around here?

Both runs are in view at the same time, so the two pieces are taken off the same area of slab and the veining is set to run the same way on each side. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The sink is chosen before the cut list is set. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What state does a Catford kitchen have to be in before you template?

A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. We would rather find it at template than on the morning, which is why the templater looks behind the units. The alcove was never square and it still is not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Units stay, so the flat is usable that evening.

07

What happens if my units are not level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. Levelling belongs in the carcasses, on their own legs and packers. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. What passed for a fit in chipboard will not pass in stone.

08

Does a stone worktop need sealing?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Sealing is the one maintenance job that genuinely differs by material, and it is worth knowing which you are buying before the slab is chosen. A seal is not waterproofing. It only buys time to wipe a spill up. The chimney breast is usually still standing with the opening blocked up, and the alcoves either side of it are rarely the same width as each other. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. What is behind the old splashback decides the new one.

09

What if the stone cannot get up the stairs in a Catford flat?

A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. A join forced by the route still sits over a gable, so it is no poorer a join for that. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. The measurement that decides everything is the diagonal between the underside of the flight above and the outer edge of the turn below it. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Disconnection happens before the old top is lifted, not during.

10

Can the sink be undermounted rather than sat on top?

A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. A Belfast or butler sink has to be installed and at its final height before the template, because the stone is cut to sit on it. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A galley closed at one end takes a short return across the top, and that little piece carries the same edge work, the same handling and nearly the same cost as a full length. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Joins move onto the gables this time round.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Worktop replacement in Catford, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.