Lewisham · BR1 SE6

Worktop replacement in Downham

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

Downham kitchens

The kitchens we meet in Downham

A good quote for worktop replacement in Downham reads like a description of your kitchen rather than a price list, and that is deliberate. One of the large interwar municipal estates, built to repeating semi and terrace plans. The standard kitchen is a small rear room about 2m by 2.7m and the usual upgrade is knocking through to the dining room for a 3.2m L with a breakfast bar. Once the template is taken the figure stops moving. Everything before that is an estimate and is described as one.

Crittall windows were swapped for plastic ones in openings that were made good rather than rebuilt, which leaves reveals that are neither straight nor equal. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. Chipboard carcasses get bracing before stone lands on them.

Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Chipboard that has taken water will not take stone.

What we are cutting for, here, is 1920s-30s LCC cottage estate, postwar infill and 1960s maisonette block. None of them is harder than the others; they are awkward in different ways.

Polished stone edge profile close up
  • 1920s-30s LCC cottage estate
  • postwar infill
  • 1960s maisonette block

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Up to four quartz samples are posted free before you commit to a colour.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
Borough
Lewisham
Postcodes
BR1, SE6
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Downham is its own job

Knowing Downham means knowing what to look at on the survey, and what to allow for when the templates are cut. Very easy: wide roads, grass verges, dropped kerbs and driveways or hardstandings on most properties, with room to park a long van directly outside. The same 3.2m L comes up constantly here, but check for the original chimney breast, it's often still there behind the plaster. We template Downham kitchens after the units are in and levelled, which is the only point at which the real measurements exist.

The work

What worktop replacement involves

A worktop replacement keeps your existing units and changes only the surface. The old top comes off, what is underneath gets checked, and the new one goes down the same day. Whatever sits on top of the old surface, tiling, an upstand or a run of sealant, has to be dealt with in the same visit, so it is priced with the job rather than left as a surprise. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement is the one worktop job where the survey and the demolition are the same piece of work. Extra support or a plywood deck goes in where the span asks for it, while the cabinets are still open and reachable. The larder recess usually holds an odd short length that has to be dealt with at the same time or lived with afterwards. The tiling line and the wall behind it are dealt with too.

Edge profiles See the options

The money

What it costs in Downham

Taking the old surface off and getting rid of it is its own line rather than something folded quietly into the stone price. An L has a return, and a return rarely nests neatly on a slab, so the yield question arrives earlier than it does on a straight run. Supply is £110 to £550 per square metre, and it is the least interesting line on the quote, because the operations listed underneath it are what separate one job from another. Priced on the kitchen you have, not the one on the plan.

ex-local-authority flats and estates

The building, and what it does to the job

The face of a breast is rarely flat, and a top returning onto it picks up that bow across the last few hundred millimetres of its length. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The alcove was never square and it still is not.

ex-local-authority flats and estates

What Downham asks for

If one job keeps us on this patch, it is this one.

ex-local-authority flats and estates

Downham in the housing figures

In the streets around Downham, a large share of the housing went up between the wars. A short run leaves nowhere to hide a join. Repeated stock means repeated units, and if they are sound the rest is straightforward. Booked around what the stock actually is.

Access

Getting stone into a Downham kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Downham is covered on our south east London run, along with the rest of Lewisham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Downham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Downham on your patch?

Yes. Downham is on the patch, and the postcodes we work here are BR1, SE6. It is worked on our south east London run, along with the rest of Lewisham. Some drives are wide enough for the van and too short for the tail lift, because the tail lift needs its own clear metre behind the vehicle. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Booking the bay for the whole day is the honest plan. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

What is different about worktop replacement in Downham?

The kitchen sits at the rear with a door to the garden and a window over the sink, so the useful run is broken into two short lengths. What catches people out is the junction between the old floor and the extension floor, which is rarely at the same level, so a run carrying across it needs the units packed before stone goes on. The floor has dropped since the kitchen went in. Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. What passed for a fit in chipboard will not pass in stone.

03

Is access a problem in Downham?

The tail lift is still the pinch point, because the piece has to be walked off it onto the trolley while it is sitting at chest height. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Whether the strip-out is a cut-up job is settled at template. Where the drive falls away from the house the trolley wants to run, and where it climbs the same load has to be pushed the whole way up. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old tops out and new stone in, both through the same gap.

04

Is Downham mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Repairable in place beats replaced whole. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. A deposit deduction rarely covers a new top.

05

What makes one Downham kitchen dearer than the next?

Butt-jointing over the gable puts the seam a few hundred millimetres back from the corner, below the eye line instead of straight across it. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The island top is the one that may want its own slab. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What holds a template up more often than anything else?

Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. This is the commonest reason a replacement turns out to need more than a straight swap. Taking the top off is what exposes the floor. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Out and in on the same permission.

07

Do you cut drainer grooves on Downham kitchens?

Grooves are machined in the workshop at the same time as the bowl cut-out, because they cannot be done well in a kitchen. The bowl position has to be settled before templating, since the grooves are set out from it. A groove set is its own item on the quote rather than something rolled in with the sink cut-out. Ceilings are lath and plaster at the front and plasterboard in the extension, and the join between the two marks where the original back wall stood. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The old cut-outs rarely match where the new appliances go.

08

Is one material less trouble than another for a Downham kitchen?

Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. A seal is not waterproofing. It only buys time to wipe a spill up. These were built in short runs of six or eight houses, so the party walls are solid brick and the rear elevation is a straight line with no outriggers. The junction between the old floor and the extension floor is where a run crossing it needs packing before stone goes on. Whatever the shell has done since is dealt with now.

09

Is the quote a fixed price or an estimate?

The quote is written from the template drawing. Before that it works from what you have described. The edge profile is its own line, so a shaped edge and a square one are two different figures. No installed price per square metre is published, because it is not a real number. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. We would rather find it at template than on the morning, which is why the templater looks behind the units. The old cut-out was hiding the notch you now need.

10

What happens if a piece will not go up the stairs?

The alternative to a join is a shorter run, which is usually the wrong thing to trade away. If a piece cannot be got in at all, we say so at the template rather than on the day. Where there is a lift, whether it can be booked out and padded matters as much as its size. Suction lifters need a clean dry face to hold, so in the wet the pads come off and the piece goes back to being carried on webbing by hand. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Two carries in one day needs the route free for both.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review

Next step

Worktop replacement in Downham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.