The building, and what it does to the job
In this corner of the borough, converted and purpose-built flats make up most of the stock. A short run leaves nowhere to hide a join. Piece length is fixed at the drawing stage, and a machined piece cannot be trimmed to fit a landing. Colour continuity is planned at selection, not hoped for.
Underfloor heating in the screed means nothing is fixed into the floor, so an island is anchored to the carcasses alone. Everything comes up in the lift, so we measure the lift car's internal diagonal before the piece is loaded, because a car that takes 2.4m on the diagonal will not take a 3m worktop no matter how you stand it. The age of the house sets the pace of it.
Ceilings are high and the units are open, so islands are exposed on all four sides and every edge and mitre is visible from across the room.
