The housing stock
What we are usually working with in Bow
Lower ground floor kitchens are reached by a stair with a winder in it, and the head height over that winder is lower than the room at either end. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Older buildings get the extra hour.
The converted mill flats have genuinely long uninterrupted runs, so you are into slab-yield planning and matched joints rather than the usual terrace offcut job. The market days on the main shopping street close the loading options completely, and side streets have permit bays with dispensation needed from the borough. Factory conversions have wide industrial stair cores and a goods lift, which is the easiest access in the area, but the flats themselves have long internal corridors with tight turns at the kitchen door.
The chimney breast has almost always been taken out of the kitchen with the stack left standing above it, so that bay of wall is newer plasterwork on a different plane. The day is planned backwards from the hall. Nothing is screwed into plasterboard and hoped for.
The kinds of building we work in here are Georgian and early Victorian square terrace, Victorian bylaw terrace, 1980s-90s factory conversion and 2010s apartment block. That mix is why two jobs on the same road can run completely differently.
There is nothing to visit in Bow. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.