Harrow · HA2 HA1

Worktop replacement in Headstone

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island beside the belfast sink, tulips on a brass tray and a wooden stool tucked under the overhang

Headstone kitchens

The kitchens we meet in Headstone

One kitchen in Headstone might take a single run along a back wall and the next an island as well, which is why worktop replacement is never quoted blind. Solid interwar family stock around the recreation ground and manor, with kitchens usually enlarged by taking in the old larder and a small rear addition rather than a full extension. Typical result is a U-shape of about 3m, 2.4m and 1.5m with a peninsula at the dining end. Send through a photograph or two and the rough run length. We will tell you what you are probably dealing with.

These kitchens have usually been retiled twice and knocked through once, and both of those leave marks the worktop has to deal with. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A thicker top changes what clears the top drawer.

These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. The cill over the sink is checked against the new upstand height before anything is cut. Units kept, surface changed, one day.

What the research records here is 1930s semi, 1920s cottage-style house and 1960s purpose-built flat. What is behind the plaster is different in each, and it matters at fixing.

Mitred waterfall edge detail on a quartz island
  • 1930s semi
  • 1920s cottage-style house
  • 1960s purpose-built flat

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
Borough
Harrow
Postcodes
HA2, HA1
Covered on
our north west London run
Fitted
5–10 working days from template

The place

Why Headstone is its own job

We are in Headstone most weeks, and it is the building rather than the stone that decides how a job here runs. Wide verged residential roads with driveways, and a fair number of houses with a genuine side passage of 900mm or more that takes a slab on edge comfortably. U-shaped kitchens need three templated pieces meeting at two internal corners, and those corners want mitred joints rather than butts if the veining is directional. Once the template is signed off the price is fixed. It does not move because the job turned out fiddly.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with tiling, sealant and the wall line all finished against the new surface, so there is no strip of old grout left showing where the previous top used to sit.

Replacement sometimes runs in the reverse order to a new fit, because the old top has to come off before what is under it can be templated. The existing top comes off in the order it went on, so the sealant is cut through first and the fixings released before anything is lifted. A side entrance lets the old run leave without going through the house, which is worth more on this job than on a fitting day. Sink and hob settled before the templater attends.

Waterfall ends See the options

The money

What it costs in Headstone

Taking the old surface off and getting rid of it is its own line rather than something folded quietly into the stone price. Two returns mean two yield problems on the same slab, and they have to be solved together rather than one after the other. That £110 to £550 per square metre buys the slab and nothing else. Templating, machining, edges, cut-outs and the fitting day are counted and charged one by one. No surprises pulled out from under the old top.

1930s and inter-war semis

Headstone in the housing figures

Across Headstone, bay-fronted inter-war housing sets the pattern. Repeated stock means repeated units, and if they are sound the rest is straightforward. What the stock predicts, the strip-out confirms.

1930s and inter-war semis

What Headstone asks for

The housing here asks for worktop installation, and this is part of that mix without leading it. Same bench, same crew, same lead time whichever one you need.

1930s and inter-war semis

The carry, and what it rules out

A side gate and a back door mean the stone never goes through the house at all, which keeps the dust and most of the risk outside. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. Cutting a top down indoors means emptying the room first.

Access

Getting stone into a Headstone kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

North west London patch

Headstone is covered on our north west London run, along with the rest of Harrow.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Headstone

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Headstone, or just list it?

Yes. Headstone is on the patch, and the postcodes we work here are HA2, HA1. It is worked on our north west London run, along with the rest of Harrow. On a drive that only takes one vehicle nose-in, the van has to reverse the whole length of it to get back out, which decides which way it goes in. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Access out counts as much as access in. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What should I expect from worktop replacement in a Headstone kitchen?

The original kitchen was a small rear room with a larder and a back door, and nearly all of them have since been opened into the dining room. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. What is under the old top is the real question. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Packing the carcasses is part of the replacement.

03

How would you get a worktop into a property in Headstone?

The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Out and in happen along the same protected route. The distance from the standing to the actual kitchen door is the number that counts, since plenty of drives finish at a side gate and a garden path. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Waste needs a space of its own and the street rarely offers one.

04

Does worktop replacement come up often in Headstone?

One of the three we are asked for most, although worktop installation is asked for more. Same template visit, same workshop, same installers either way. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Between tenancies is the only window there is. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. The carcasses have to be sound, because stone is several times the weight of what is coming off. One plot replaced years on, matched or otherwise.

05

What moves the number on a quote around here?

The two returns in a U are close to the same size and it is tempting to nest them side by side, except that the veining then mirrors across the room and reads as deliberate for the wrong reason. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Any overhang gets underpinned first. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What state does a Headstone kitchen have to be in before you template?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. This is the commonest reason a replacement turns out to need more than a straight swap. The laminate has been covering it up. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Somebody has to own the skip.

07

Where will the joins be?

Each join is an item on the drawing, so the layout and the figure move together. A join sits over a cabinet gable. It never spans a gap and never runs through a cut-out. A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. Three runs is three scribes and three separate lifts, so a U takes longer on site than its metreage suggests even on a day when nothing goes wrong. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The shape is measured again, not copied off the old top.

08

I have a slab already. Can you template and fit it in Headstone?

The quote is itemised, so a job where you already hold the slab is the same job with the material line taken off it. Supply through us runs £110 to £550 per square metre for the slab alone, which is the line you would be removing. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. A surface swap is the fastest upgrade available on a kitchen that is otherwise sound. Shared-house tops take a decade of hard use.

09

What if the base units are out of level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. A sloping floor is not the problem. The plane the unit tops finish in is. Levelling belongs in the carcasses, on their own legs and packers. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day.

10

Do I have to get rid of the old tops myself in Headstone?

Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. What changes is the surface. The carcasses underneath stay where they are. Deep gravel takes the wheels of a loaded trolley and holds them, so either boards go down or the pieces are carried. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. A timed bay does not cover a strip-out and a fit.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Worktop replacement in Headstone, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.