Harrow · HA2 HA1

Kitchen worktops in Headstone

Solid interwar family stock around the recreation ground and manor, with kitchens usually enlarged by taking in the old larder and a small rear addition rather than a full extension. Typical result is a U-shape of about 3m, 2.4m and 1.5m with a peninsula at the dining end.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

The housing stock

What we are usually working with in Headstone

The kitchen door opens inwards into the middle of a run, so the usable length of that wall stops well short of the corner. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. The first hour is protection and packing, not stone.

A good number have a garage attached to the flank wall with a door through from the kitchen, which is both a way in and a stretch of wall the run cannot use. Access is usually the easy part here, as most of these have a side gate and a back door straight into the kitchen, so we carry down the side alley rather than through the house and keep the mess outside. Where the wall bellies, the top is eased in against it.

What the surveys keep coming back to is 1930s semi, 1920s cottage-style house and 1960s purpose-built flat. A quote that ignores which one you have is guessing.

Access. Wide verged residential roads with driveways, and a fair number of houses with a genuine side passage of 900mm or more that takes a slab on edge comfortably.

There is nothing to visit in Headstone. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Harrow
Postcodes
HA2, HA1
Covered on
our north west London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1930s semi
  • 1920s cottage-style house
  • 1960s purpose-built flat

Harrow

Headstone in the housing figures

In Headstone, much of the housing went up in the twenties and thirties. Repeated stock means repeated units, and if they are sound the rest is straightforward. Disposal is a line on the quote, not a surprise.

The building, and what it does to the job

U-shaped kitchens need three templated pieces meeting at two internal corners, and those corners want mitred joints rather than butts if the veining is directional.

Getting stone into the room

A side gate hung to open outward against a fence post is narrower in use than it measures, and lifting the gate off its hinges is usually the quickest win on the route. A stone top being taken out is cut down in place wherever the route will not take it whole. The strip-out is planned around it.

Edge profiles See the options

Nearby

We also work around Headstone

Headstone is one of 21 places we cover in Harrow. Where else we work in Harrow

The whole Watford patch

Questions

Working in Headstone

01

Do you take on Headstone kitchens?

Yes. Solid interwar family stock around the recreation ground and manor, with kitchens usually enlarged by taking in the old larder and a small rear addition rather than a full extension. Typical result is a U-shape of about 3m, 2.4m and 1.5m with a peninsula at the dining end. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. A drive and a red route make two different fitting days.

02

What is the housing like from a worktop point of view in Headstone?

1930s semi, 1920s cottage-style house and 1960s purpose-built flat. The gas meter box is fixed to the flank wall beside the alley and stands proud enough to matter when a long piece is coming past it on edge. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. The shell has the last word on fitting day.

03

Is getting the worktop in the hard part in Headstone?

Wide verged residential roads with driveways, and a fair number of houses with a genuine side passage of 900mm or more that takes a slab on edge comfortably. Where the garden is level and the back door is wide the pieces get staged outside on trestles and brought in one at a time as the fitters are ready for them. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. It sets what the day actually looks like.

04

What do you get asked for most in Headstone?

Worktop installation and worktop replacement, in that order. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Nothing else in the room has to change. U-shaped kitchens need three templated pieces meeting at two internal corners, and those corners want mitred joints rather than butts if the veining is directional.

05

Why do Headstone quotes vary so much?

With three walls in play the chance of one of them being out of square is high, and the template has to carry all three angles. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Levels are checked across the walkway, not along one side. Once the carcasses are levelled the gap under the plinth varies along the run, and that varying gap is the honest record of what the floor is doing. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Same footprint, different tolerances. Supply-only material opens at £110 per square metre, and templating, fabrication and fitting are quoted line by line rather than as a single number.

06

Is a leasehold flat in Headstone any harder to do?

Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The gap between tenancies is the whole window. Say what the building is at the booking stage and the lift, the stair turn and any freeholder notice become part of the plan rather than a surprise.

07

I have a slab already. Can you template and fit it in Headstone?

Templating, fabrication and fitting are the same three lines whether the stone came from us or from you. Remnants bought elsewhere are the awkward case, because the drawing is then made to fit the stone. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.

08

Can the sink be undermounted rather than sat on top?

A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. The advantage of a U is that every join can be put over a gable in a corner, so nothing lands in the middle of a clear length. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. A seam under a rooflight gets the extra minutes.

09

What if the base units are out of level?

A sloping floor is not the problem. The plane the unit tops finish in is. Where a run meets an appliance, level decides whether that appliance door still clears the stone above it. Levelling belongs in the carcasses, on their own legs and packers. A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. This is the commonest reason a replacement turns out to need more than a straight swap. The sill was always low. Nobody had to care until now.

10

Is a full-height splashback practical in a Headstone kitchen?

A full-height piece behind the hob has to allow for the extractor, so that gets settled first. Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Ceilings run to about two point four metres, so wall units, a splashback and an extractor are all competing for the same short band of wall. The carry is the easy part; the plaster around the old breast and the packing over a moved floor are not. Old fabric gets handled as old fabric.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Get your Headstone kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.