Harrow · HA2 HA1

Splashbacks and upstands in Headstone

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska quartz running round a U-shaped kitchen in taupe handleless units, the sink under the window and a peninsula beyond

Headstone kitchens

The kitchens we meet in Headstone

Two kitchens a street apart in Headstone can turn splashback and upstand work into two quite different pieces of work, which is why nothing is priced from the doorstep. Solid interwar family stock around the recreation ground and manor, with kitchens usually enlarged by taking in the old larder and a small rear addition rather than a full extension. Typical result is a U-shape of about 3m, 2.4m and 1.5m with a peninsula at the dining end. Plenty of kitchens do not match either description exactly, which is what the measured survey is there to sort out.

A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. The extractor position is measured before the panel is drawn.

The chimney breast in the corner has usually been left in place, so the run gains a return and two scribed ends. Where a full-height panel is wanted, the wall is made good first or the panel rocks on the high spots. A reveal in a thick wall changes where the panel stops.

The kinds of building we work in here are 1930s semi, 1920s cottage-style house and 1960s purpose-built flat. The template reads them differently even where the layout looks identical.

Polished stone edge profile close up
  • 1930s semi
  • 1920s cottage-style house
  • 1960s purpose-built flat

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
Borough
Harrow
Postcodes
HA2, HA1
Covered on
our north west London run
Fitted
5–10 working days from template

The place

Why Headstone is its own job

Nothing about fitting stone in Headstone is guesswork on our part, because guesswork with a machined slab is expensive. Wide verged residential roads with driveways, and a fair number of houses with a genuine side passage of 900mm or more that takes a slab on edge comfortably. U-shaped kitchens need three templated pieces meeting at two internal corners, and those corners want mitred joints rather than butts if the veining is directional. We sort it out with a template, then the quote says what sorting it out costs.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. Where a run is longer than one sheet will cover, the break is put on a vertical that has a reason to be there, and the two edges are cut as a pair so the seam closes without filler. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. The old larder wall in these houses is a single skin with a bow through it, and a hand's width of stone hides what a tall sheet would advertise. The panel clears the extractor before it is machined.

Edge profiles See the options

The money

What it costs in Headstone

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. A U is three runs and two corners, so the join count and the edge metreage both rise faster than the floor area does. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. Priced by the edge and the openings, not the wall.

1930s and inter-war semis

Headstone in the housing figures

In this neighbourhood bay-fronted inter-war housing sets the pattern. Where the boiler or the flue sits in one spot house after house, the panel is drawn round it once and reused. The joint line is planned, not discovered.

1930s and inter-war semis

The building, and what it does to the job

Where two pieces meet over a fall in the floor the join has to be flush to the hand as well as true to the level, because the eye reads the join and forgives the room. A mitred external return around it has to come from the same position in the slab, or the pattern visibly steps at the corner. Scribed, dubbed out, or set proud. Pick one.

1930s and inter-war semis

What Headstone asks for

This one is uncommon here and there is no advantage in pretending otherwise. Worktop installation and worktop replacement come up far more often. Quoting, fabrication and fitting are identical either way.

Access

Getting stone into a Headstone kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

North west London patch

Headstone is covered on our north west London run, along with the rest of Harrow.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Headstone

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Headstone, or just list it?

Yes. Headstone is on the patch, and the postcodes we work here are HA2, HA1. It is worked on our north west London run, along with the rest of Harrow. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Long panels and long carries do not mix. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop splashbacks & upstands in Headstone?

These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Blown plaster comes off before stone goes on. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The obstruction sets the joint, not the wall.

03

Is access a problem in Headstone?

A step up to a patio or a raised threshold at the back door means the piece is lifted rather than rolled, and that is where the crew size gets decided. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. A shared drive is only useful if the neighbour is not the one parked behind the van, so we ask which side the standing belongs to before the date is set. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Off the van last, and never in a hurry.

04

Is worktop splashbacks & upstands what Headstone is known for?

Not really, and there is no sense dressing it up. What the research on this patch actually lists is worktop installation and worktop replacement. That is a statement about the local housing rather than about the work. It gets quoted, cut and fitted exactly as it would anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Wipe-down beats sealed grout on a turnaround. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Plot spec panels are ordered by the plot, not the room.

05

What makes one Headstone kitchen dearer than the next?

A U puts the sink in one leg, the hob in another and any drainer grooves in whatever is left, which spreads the cut-outs about but does not reduce the machining time. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Every internal corner is two pieces, not one. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What holds a template up more often than anything else?

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Height follows the sill, not the plan. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. One visit for upstands, two for full-height panels.

07

Is templating a separate visit from fitting?

The same firm templates and fits. Nobody else is brought in to install. No payment is due before the template. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. Solid brick with a sand and cement render is firm to work against and reliably out of plumb across the length of a run. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Behind the hob is where full height earns its cost.

08

Do you take the old worktop away?

Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. Disposal means it goes in the van, not into the garden to wait for a collection. On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. The crate exists for the walk from the van.

09

What maintenance does a worktop need in a Headstone kitchen?

Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Sealing is the one maintenance job that genuinely differs by material, and it is worth knowing which you are buying before the slab is chosen. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. The original kitchen was a small rear room with a larder and a back door, and nearly all of them have since been opened into the dining room. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. The wall build-up sets the depth of the return.

10

What happens when the route into a Headstone kitchen is tighter than the worktop?

The alternative to a join is a shorter run, which is usually the wrong thing to trade away. An external stair, a side return or a rear garden counts as carry and is measured the same way. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. A side gate and a back door mean the stone never goes through the house at all, which keeps the dust and most of the risk outside. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review
★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz

Next step

Splashbacks and upstands in Headstone, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.