The building, and what it does to the job
Across this patch very few homes are lived in by their owners. The rooms therefore start closer to true than in most of London. The changeover fits inside one working day, with no night without a kitchen. The kitchen goes back into use the same evening.
Handover kitchens are fitted with the cheapest carcass the specification allowed, and cam-lock chipboard boxes are what a stone top has to sit on. If the diagonal is short we either split the run with a planned join or, on lower floors, carry up the stairwell, which needs the half-landing turn checking as well. Old floors get packed, not argued with.
Structural columns in the middle of opened-up flats are common, and a top that has to notch round one needs the column dimensions taken at template, not from a plan.
