The housing stock
What we are usually working with in Canary Wharf
A fob on the communal door and a shared lift mean the carry is timed rather than continuous. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. A bad floor is corrected under the carcass, never with sealant.
Kitchens are almost entirely open-plan against a structural core wall, with a 3m to 3.5m run of full-height units and an island of 2m to 2.8m that doubles as the dining table. Specifications lean towards large-format porcelain and Dekton for slim edges and matching splashbacks, with waterfall ends on the island.
Goods lifts are booked in advance by the building manager in fixed slots, and residential floors are reached only after a long basement corridor trolley run. This is a privately managed estate: vehicles need a permit, deliveries go through designated basement loading docks with height restrictions around 2m, and security clearance plus insurance documents are checked at the gate. The paperwork and the goods lift booking take longer than the fit, and a missed slot means the slab goes back on the van.
Kitchens are compact and standardised, which makes the fixed template, fabrication and fitting lines a larger share of the total than the stone. The carry is the constraint. The building moved decades ago and the fit allows for it.
Around here the stock is 2000s residential tower, 2015 onwards high-rise apartment and dockside penthouse duplex. They were built to different tolerances, and the stone has to absorb that.
Quartz and stone worktops in Canary Wharf