Croydon · CR8

Splashbacks and upstands in Riddlesdown

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska quartz running round a U-shaped kitchen in taupe handleless units, the sink under the window and a peninsula beyond

Riddlesdown kitchens

The kitchens we meet in Riddlesdown

Half of what we get asked about splashback and upstand work in Riddlesdown could be answered by a tape measure and ten minutes in the room in question. Inter-war stock strung along the ridge, mostly semis with a rear kitchen extended by 2-3m to make a kitchen-diner with a peninsula and garden doors. Wall runs of about 3.6m are typical and full islands are rare because the rooms are long rather than wide. The survey answers it, the drawing records it, and you sign off the drawing before a single sheet is cut.

Suspended floors at the front meet a solid slab in the extension somewhere in the middle, and the units sit across the change. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The batch is held while the tops are cut, or the colour drifts.

The scullery floor was quarry tile bedded on concrete and it is often still under a laminate, sitting lower than the boards in the room it now joins. Behind a hob the panel runs to the underside of the extractor, and that height is settled on site rather than on the plan. The wall makes that decision, not the brochure.

What we are measuring in, mostly, is 1930s semi, 1930s detached, post-war infill and chalet bungalow. That mix is why two jobs on the same road can run completely differently.

Polished stone edge profile close up
  • 1930s semi
  • 1930s detached
  • post-war infill
  • chalet bungalow

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Croydon
Postcodes
CR8
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Riddlesdown is its own job

Half of quoting a kitchen in Riddlesdown is understanding the approach to it, which is why the survey is done in person. Narrow hillside roads with parking on both sides and short steep drives, plus the railway cutting means several streets are dead ends with no turning space for a long van. Dead-end hillside roads mean reversing a loaded van out, so we take the smaller vehicle here and make two trips rather than one. The template is where the room stops being a drawing and starts being measurements, and the price follows the measurements.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. The wall is read for how flat and how plumb it is before anything is drawn, because a panel that stands off a bowed wall at one end shows it along its whole length. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. Ceilings are generous here and the units stop well below the picture rail, so full height is genuinely tall and the sheet gets heavy. Machined to the room, not trimmed to it.

Edge profiles See the options

The money

What it costs in Riddlesdown

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. Quoted as its own item, so the grout line has a price.

1930s and inter-war semis

The shape of the run

The offcut taken out of the middle for a hob is a large usable piece, and it is worth deciding early whether it becomes an upstand or goes in the skip. Where the run carries a join, the panel behind it is broken in the same place, so the two seams line up instead of sitting a hand-width apart. A galley shows both walls at the same time.

1930s and inter-war semis

The carry, and what it rules out

A step up from the drive to the threshold turns the last two metres into a lift, and a lift is where two pairs of hands become the minimum. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. The longer the walk, the fewer the panels per trip.

1930s and inter-war semis

What Riddlesdown asks for

The housing on this patch does not throw up much of this. It throws up worktop installation and worktop replacement. When it does come up, it gets the same template, the same bench and the same crew.

Access

Getting stone into a Riddlesdown kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

Riddlesdown is covered on our south London run, along with the rest of Croydon.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Riddlesdown

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Riddlesdown on your patch?

Yes. Riddlesdown is on the patch, and the postcodes we work here are CR8. It is worked on our south London run, along with the rest of Croydon. Where the van cannot turn on the plot it has to arrive already facing the right way, so the approach along the street is part of the plan. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A narrow gap between parked cars decides how a panel turns. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about Riddlesdown buildings that catches worktop splashbacks & upstands out?

The classic arrangement is the original back room with a later extension bolted onto it, so the kitchen is two ages of building in one room. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Cut from the same slab run as the tops. Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The obstruction sets the joint, not the wall.

03

What do you check about the route into a Riddlesdown property?

Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The ceiling over a staircase limits a standing panel as much as the walls. A drive behind an electric gate depends on somebody being in to open it and on the gate staying open while the load comes off. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. These travel flat and get carried on edge, and both want room.

04

Do you get much worktop splashbacks & upstands work in Riddlesdown?

Not really, and there is no sense dressing it up. What the research on this patch actually lists is worktop installation and worktop replacement. That is a statement about the local housing rather than about the work. It gets quoted, cut and fitted exactly as it would anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. A spare panel is cheaper now than next year. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Reordered next year, it will not match.

05

Why do two Riddlesdown kitchens the same size price differently?

It is walked round rather than looked at from one side, so the direction the veining runs along it cannot be hidden against a wall the way it can on a perimeter run. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Return ends are polished, not left sawn. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What has to be finished before you can template?

Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Height follows the sill, not the plan. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Where two people share the decision it helps to know early which of them is settling the edge profile and which is settling the budget, because it is rarely the same person for both. Full-height panels need the wall made good first, which is another trade and another timescale. An owner can wait for it; a void period cannot.

07

What is the order of events on a Riddlesdown kitchen?

The template is taken in your kitchen after the units are in and fixed, never before. No payment is due before the template. The same firm templates and fits. Nobody else is brought in to install. The rear extension is usually the newest and truest part of the building, so it is the older half of the kitchen that gives the trouble. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. A return into a reveal is its own scribed piece.

08

What is not included in the quoted figure?

Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. What moves the figure after templating is a change you make: a different edge, an extra cut-out, a bigger sink chosen late. The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Scribed along the top edge as well.

09

What happens if a piece will not go up the stairs?

The alternative to a join is a shorter run, which is usually the wrong thing to trade away. The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. A level threshold with hard standing outside it is the one arrangement where a full run goes in without a single re-grip. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A polished face close to an edge does not survive a knock.

10

What is the difference between an upstand and a splashback?

If it is a decision for later, say so at the template: the match is a question about the batch. An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. Tiling and stone can meet, but where they meet is decided before the template rather than after. A side alley and a back door mean most pieces go in whole, and it is the alley width rather than the front door that decides it. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Decided before fabrication starts.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review
★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is very practical for everyday use. Highly recommend Worktop Worx for anyone looking for quality quartz worktops.”
RO74 TVXGoogle review · Calacatta Gold

Next step

Splashbacks and upstands in Riddlesdown, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.