Skip to content

Wandsworth · SW15

Splashbacks and upstands in Roehampton

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Roehampton kitchens

What the kitchens here are actually like

1950s modernist slab and point blockInterwar cottage estateRoehampton village Georgian and Victorian

Kitchens in this stock are compact and reasonably square, which makes the fixed lines a larger share of the total than the material is. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Siliconed to the top, never grouted.

The postwar estate flats have small standardised kitchens, typically 2m by 3m, with services boxed at one end and a fixed sink and cooker position, so refits are straight runs with a return. The older village properties and the cottage estate houses have conventional rear kitchens with more scope for an L or a small peninsula.

In the tower and slab blocks the lift car depth is the hard limit — anything over about 2m has to be cut to fit the car, so the joint position is decided by the building, not the kitchen.

Walls are dense block or in-situ concrete with a bonded plaster, so the bottom course of tiles brings plaster with it when the old top comes off. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. The wall makes that decision, not the brochure.

What we are usually templating in is 1950s modernist slab and point block, Interwar cottage estate and Roehampton village Georgian and Victorian. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the New Malden patch. Fitted 3–7 working days from template.

post-war terraces and 1960s housing

What gets asked for here

Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.

Honestly, this is not what we do most on this patch. Worktop replacement, worktop installation and worktop fabrication come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

post-war terraces and 1960s housing

Getting stone into the room

The slab blocks are set back from the road behind landscaping with long approach paths, controlled entry and lifts that are undersized for stone, and the upper floors make a stair carry impractical. Booked lift access and an early slot are essential.

Access

Getting stone into a Roehampton kitchen

The slab blocks are set back from the road behind landscaping with long approach paths, controlled entry and lifts that are undersized for stone, and the upper floors make a stair carry impractical. Booked lift access and an early slot are essential.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Roehampton is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Roehampton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Roehampton?

Yes. Roehampton is on the patch, and the postcodes we work here are SW15. It is run from the New Malden side, covering South West London & Surrey. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Roehampton change how worktop splashbacks & upstands works?

Many have been extended at the rear since being sold, so the kitchen is half original and half newer with a floor junction between the two. Dense concrete takes adhesive better than fixings, which actually suits a large bonded panel. The wall makes that decision, not the brochure. In the tower and slab blocks the lift car depth is the hard limit — anything over about 2m has to be cut to fit the car, so the joint position is decided by the building, not the kitchen.

How does the stone actually reach a kitchen in Roehampton?

The slab blocks are set back from the road behind landscaping with long approach paths, controlled entry and lifts that are undersized for stone, and the upper floors make a stair carry impractical. Booked lift access and an early slot are essential. Piece length is set by the internal diagonal of the lift car, not by the length of the slab. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. That is agreed at template, not on fitting day. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is Roehampton really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop fabrication. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

Why do two Roehampton kitchens the same size price differently?

Because a peninsula is seen from both sides, the underside of any overhang gets the same edge treatment as the top, which is easy to leave out of a spec. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Same slab run as the tops.

Next step

Splashbacks and upstands in Roehampton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398