Wandsworth · SW15

Splashbacks and upstands in Putney Heath

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Putney Heath kitchens

The kitchens we meet in Putney Heath

People ring us about splashback and upstand work in Putney Heath at the point where they have a kitchen in mind and no idea what their own walls are going to do to it. Postwar blocks around the heath have separate kitchens of a fixed size with a sink under the window and a hatch to the dining area, and the usual work is a like-for-like top with matching upstands. The detached houses backing onto the heath take larger open-plan schemes with an island. We measure the kitchen you have, not the kitchen the plans said you would have. Those two part company often.

A stub wall divides the kitchen from the back lobby, and it rarely stayed where the original drawing put it. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Sockets move on paper more easily than in stone.

Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. A hundred millimetres covers more than it looks.

What the research records here is Interwar detached, 1950s and 60s purpose-built block and Postwar estate housing. The floor datum is the thing that changes most between them.

Mitred waterfall edge detail on a quartz island
  • Interwar detached
  • 1950s and 60s purpose-built block
  • Postwar estate housing

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
Borough
Wandsworth
Postcodes
SW15
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Putney Heath is its own job

Every area has its own complications, and in Putney Heath these are the ones that decide the day. The blocks are set in landscaped grounds with parking courts some distance from the entrances, so there is a long paved carry before you reach any lift or stair. Lifts in these blocks are small passenger cars that will not take a full slab upright. Hatch openings between kitchen and dining room mean the worktop often has to be finished on two faces and polished on the exposed edge inside the opening. Somebody comes out to Putney Heath, looks at all of it, and puts a number on it before you decide anything.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Behind a hob the choice of material stops being about looks: a resin-based surface will mark under sustained heat where a sintered one will not. A window sill sitting lower than the surface settles the argument on its own: the strip runs into the reveal, returns, and the wall above is left alone. The back wall is commonly a single leaf with an air brick through it, and a tall sheet either takes the vent or stops below it. Machined to the room, not trimmed to it.

Waterfall ends See the options

The money

What it costs in Putney Heath

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Supply-only material is £110 to £550 per square metre. The more useful question is not which end of that you are at, but how many operations the cut list carries. Quoted as its own item, so the grout line has a price.

period detached houses and villas

The carry, and what it rules out

Goods lifts and passenger lifts fail differently: one has a rated load that matters, the other has a door aperture that matters more. Upstands are short enough to go almost anywhere, which is why a difficult route often ends in upstands rather than full-height panels. What can be got into the room decides the height above the worktop.

period detached houses and villas

Putney Heath in the housing figures

Taken across Putney Heath and the roads either side of it, most of the housing went up between the late forties and the early eighties. Where the boiler or the flue sits in one spot house after house, the panel is drawn round it once and reused. Cut to the wall as found.

period detached houses and villas

What Putney Heath asks for

This comes up here often enough to be routine, though worktop replacement comes up more. Worktop replacement and worktop installation make up the rest of what we do on these streets.

Access

Getting stone into a Putney Heath kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Putney Heath is covered on our south west London run, along with the rest of Wandsworth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Putney Heath

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Putney Heath far enough out to be a problem for you?

Yes. Putney Heath is on the patch, and the postcodes we work here are SW15. It is worked on our south west London run, along with the rest of Wandsworth. With no scheme to work with there is nothing to book and nobody to ring, so the only levers left are an early arrival and a word with the neighbours. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A panel carried past a live lane gets a second pair of hands. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

Does the housing in Putney Heath change how worktop splashbacks & upstands works?

The kitchen is at the front or the back depending on the plan, and which it is decides whether there is a rear door on the route at all. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. A bowed wall is what decides between an upstand and a panel. Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The panel takes its height off the steel.

03

How does the stone actually reach a kitchen in Putney Heath?

Handrails, mirrors and a sloping ceiling panel all eat into the usable diagonal, and none of them appear on a lift specification sheet. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. They stand upright in the van and stay upright until they are on the wall. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Nothing this long gets walked while a warden is circling.

04

Do Putney Heath kitchens ask for worktop splashbacks & upstands much?

One of the three we are asked for most, although worktop replacement is asked for more. Same template visit, same workshop, same installers either way. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Panels for every unit, cut in one go. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. A spare panel is cheaper now than next year.

05

What am I actually paying for, line by line?

A corbel on show under an overhang is a decision about how the piece looks from a stool, so it gets settled alongside the edge profile rather than left to whoever fits it. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Return ends are polished, not left sawn. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

Is there anything I have to finish before the template in Putney Heath?

Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Upstands sit tight because both edges are cut. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. Access is arranged through a managing agent or a scheme office rather than with the household directly, so a date gets confirmed once in writing and moving it costs a fortnight. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Plastering finishes on somebody else’s timescale.

07

How much upkeep is a stone worktop?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Marble is the one people underestimate. It is porous, like granite, and wants sealing. These were built on a solid ground floor slab, so nothing bounces and nothing can be packed down, only up. Patched plaster next to original render sits at different depths, and that step is exactly what an upstand covers. Dry lining behind a panel needs a fixing plan of its own.

08

What do you need from me for the sink and hob cut-outs?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A tap under a window board still needs room for its handle to lift, which is checked at the template. The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. A downdraught extractor takes a long slot out of the middle of the piece and a motor housing out of the cabinet below it, so what sits under the top is settled before anything is cut. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Panel widths answer to the slab before the wall.

09

Can I have stone up the wall in a Putney Heath kitchen?

An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. A boiler in a cupboard on the kitchen wall is normal in this stock, and its position is fixed by its flue. A 100mm band is the reliable choice unless the wall has been skimmed level from end to end. Old plaster rarely gives you a flat metre.

10

What if something breaks during the fit?

The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. A remade piece is cut from the same slab run wherever the slab allows, because a replacement from another batch will not match across a join. A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. A lift out of service for the day turns a straightforward install into a stair carry, so the slot gets confirmed with whoever manages the building rather than against a calendar. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A door frame catches a tall panel long before a short one.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!”
Dawid MyszorGoogle review · Capri White
★★★★★
“Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌”
Costin RomanGoogle review
★★★★★
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5”
Kam 98Google review

Next step

Splashbacks and upstands in Putney Heath, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.