Havering · RM7

Splashbacks and upstands in Rush Green

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Rush Green kitchens

The kitchens we meet in Rush Green

Anyone who has already replaced a kitchen in Rush Green will tell you that splashback and upstand work is decided by the room long before anyone opens a colour chart. Uniform inter-war semis and terraces on the Dagenham border where kitchens are compact and largely unaltered, so a lot of the work is a practical refresh: new tops, new sink, matching upstands, keeping the existing units. Where a rear extension has gone in, it is usually a shallow one adding a metre and moving the sink to the new back wall. Send through a photograph or two and the rough run length. We will tell you what you are probably dealing with.

The consumer unit and the meter often sit high on the wall at one end of the kitchen, and neither of them is going to move to suit a run of stone. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The batch is held while the tops are cut, or the colour drifts.

The windows were steel to begin with and have been swapped for plastic in openings lined out to suit, so the reveal is now deeper than the brickwork behind it. Where a full-height panel is wanted, the wall is made good first or the panel rocks on the high spots. Cut from the same slab run as the tops.

The housing behind these kitchens is 1930s semi, 1930s terrace and post-war infill. What is behind the plaster is different in each, and it matters at fixing.

Mitred waterfall edge detail on a quartz island
  • 1930s semi
  • 1930s terrace
  • post-war infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Havering
Postcodes
RM7
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Rush Green is its own job

What we want to establish about your kitchen in Rush Green is how we get to it and what we will be fixing against. Straightforward suburban streets with dropped kerbs on many houses and a shared side passage between semi pairs, though the main roads through here carry hospital traffic and are not somewhere to unload. Shared side passages between semi pairs are legally the neighbour's half as well, so we ask before wheeling a slab down one. Everything above is looked at on the free design visit, and none of it is charged for until the template.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Splashbacks and upstands are the part of the job that takes the grout line out of the kitchen, which is what most people are really asking for when they ask about stone behind the hob. Every outlet on that wall is recorded at its finished face beforehand, since a machined opening in a sheet of stone has no tolerance to move into. The old larder wall in these houses is a single skin with a bow through it, and a hand's width of stone hides what a tall sheet would advertise. Cut from the slab the worktop came out of.

Waterfall ends See the options

The money

What it costs in Rush Green

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. Height is a decision with a figure against it.

1930s and inter-war semis

Rush Green in the housing figures

Locally the banding is well below the London middle. Corners tend to come in close to square. Ordered later, from a different batch, the match is not reliable where the pieces meet. Nothing cut until the tiling decision is final.

1930s and inter-war semis

What Rush Green asks for

Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Where the same panel repeats across units it is cut as a set, so a damaged one can be swapped for its twin. A spare panel is cheaper now than next year.

Not the first thing this housing asks for, since that is worktop replacement, but well inside what we do here weekly.

Access

Getting stone into a Rush Green kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Rush Green is covered on our east London run, along with the rest of Havering.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Rush Green

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Which postcodes do you cover around Rush Green?

Yes. Rush Green is on the patch, and the postcodes we work here are RM7. It is worked on our east London run, along with the rest of Havering. Overhanging branches clear the roof of a car and catch the roof of a van, so the drive is looked at from the driver seat rather than from the doorstep. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. These travel flat and get carried on edge, and both want room. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in Rush Green do to worktop splashbacks & upstands?

The original room is timber over a ventilated void and the newer half is a slab, so the floor gives underfoot on one side of the junction and not on the other. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Decided before fabrication starts. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The obstruction sets the joint, not the wall.

03

Do you have trouble getting long pieces into Rush Green kitchens?

The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A vertical break is easier to live with than a cracked panel. On a drive that only takes one vehicle nose-in, the van has to reverse the whole length of it to get back out, which decides which way it goes in. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Where the van has to move, the panels come in first.

04

Is there a lot of worktop splashbacks & upstands work in Rush Green?

One of the three we are asked for most, although worktop replacement is asked for more. Same template visit, same workshop, same installers either way. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Reordered next year, it will not match. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Full height behind the hob is less for a tenant to scrub.

05

What decides the price of a worktop in Rush Green?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Socket cut-outs are machined, not chipped in on site. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What do I need to sort out first?

Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Height follows the sill, not the plan. The old tiling must be off and the wall made good and dry before templating, not on fitting day. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Whoever specifies it signs the drawing.

07

When do I pay for a Rush Green worktop?

Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed along the top edge as well.

08

What do you need from me for the sink and hob cut-outs?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. A peninsula end takes a panel on both faces.

09

Where will the joins be?

Join count and position are settled from the template drawing rather than improvised on the fitting day. A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. There are only ever a few legal positions, and the one taken is furthest from the light. Both runs are in view at the same time, so the two pieces are taken off the same area of slab and the veining is set to run the same way on each side. The panel behind a hob is usually the tallest piece in the kitchen, and its height is set by the extractor above it rather than by the wall cupboards either side. Scribe to the wall rather than stretch the panel.

10

Can a damaged worktop be repaired in place?

Chips at an edge or a corner are the usual form, because that is where stone is least supported. Door frames and the stair route are protected too, since most contact happens on the way in. A dropped pan years later is a different question, and stone is remade rather than filled either way. Rear access usually lets us fit longer pieces whole, so the join count ends up decided by the slab rather than by the building. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Full height goes in only where the way in allows full height.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review
★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review

Next step

Splashbacks and upstands in Rush Green, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.