City of London · EC1A EC1M

Worktop replacement in Smithfield

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Smithfield kitchens

The kitchens we meet in Smithfield

The reason worktop replacement in Smithfield is quoted per kitchen rather than per metre comes down to the range of rooms these worktops end up in. Loft conversions in former market and warehouse buildings give big open plans with island runs of 3-4m under high ceilings, often with exposed brick and cast-iron columns landing awkwardly close to the run. The Georgian houses around the square are the opposite - narrow, listed, with kitchens at basement or ground of 2.4-3m and floors that are anything but level. Nothing gets cut from a description. It gets cut from a template taken off the units once they are in.

The original openings were sized for goods, but the residential doors dropped into them were not. Taking the old tops off is also the first honest look at what has been going on underneath them. A sound carcass takes stone; a soft one gets replaced first.

Windows are large industrial openings with deep sills, and a run finishing at one meets a reveal a full brick deep. Many of these kitchens are island pods in the middle of an open plan with waste and feeds coming up through the floor, so the island cannot be nudged to suit the stone and the stone gets cut to suit the island. Units kept, surface changed, one day.

The stock we template in here is warehouse and cold-store loft conversion, Georgian townhouse around the square, converted meat trade building and recent apartment scheme. Which one you have changes the order of the day more than the design does.

Undermounted sink cut-out in a quartz worktop
  • warehouse and cold-store loft conversion
  • Georgian townhouse around the square
  • converted meat trade building
  • recent apartment scheme

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • New stone is fitted five to ten working days after the measure.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
  • Old tops come out in the morning, new stone is down and sealed the same day.
Borough
City of London
Postcodes
EC1A, EC1M
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why Smithfield is its own job

The questions we ask about a job in Smithfield are about the route, the doorways and the walls, not about the finish. The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window. Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up. Cast-iron columns in these lofts are never quite where the drawing says, so scribe the island around the column rather than trusting a plan dimension. Whatever the building does to a straight line, it is measured on the template and drawn before anything is cut.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Replacement is the one worktop job where the survey and the demolition are the same piece of work. A bonded stone top is broken down where it sits before it is taken out, because it will not come away from the cabinets whole. Runs are long and open, so the old top comes out in fewer pieces than usual and needs more hands to move. The old surface leaves in our van, not your garden.

Sink cut-outs See the options

The money

What it costs in Smithfield

The saving on a replacement is that you keep the units. The risk is what is found under the old top, and that is checked before a deposit rather than after. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Supply is £110 to £550 per square metre, and it is the least interesting line on the quote, because the operations listed underneath it are what separate one job from another. Priced on the kitchen you have, not the one on the plan.

warehouse and wharf conversions

Smithfield in the housing figures

Around here the great majority of homes sit in blocks rather than on their own plot. A stone top leaves in sections, and getting those sections down the stairs is where the labour goes. The kitchen is usable again by evening.

warehouse and wharf conversions

The carry, and what it rules out

Where only one car serves the building a breakdown on the morning halts the job outright, so the fallback route is worked out at template rather than on the landing. The old tops leave by the same route, so the carry out and the skip or van are planned alongside the carry in. Waste goes out the way the stone came in, so the route stays clear.

warehouse and wharf conversions

What Smithfield asks for

Around here this is occasional rather than routine. The routine ones are worktop fabrication and worktop installation. That is a comment on the buildings and on nothing else.

Access

Getting stone into a Smithfield kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

City of London patch

Smithfield is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Smithfield

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Smithfield, or is it a subcontractor?

Yes. Smithfield is on the patch, and the postcodes we work here are EC1A, EC1M. It is worked on our City of London run, along with the rest of the Square Mile. With no scheme to work with there is nothing to book and nobody to ring, so the only levers left are an early arrival and a word with the neighbours. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Nothing goes out until the route back to the van is clear. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

What do the kitchens in Smithfield do to worktop replacement?

Services run on the surface in these buildings, so conduit and pipework cross the wall behind the units and stand proud of it. Converted warehouses put the kitchen against original brick or blockwork that has never been made flat, so scribes of 15 to 20mm along a run are normal and every piece is templated to the wall exactly as it is rather than to a drawing. What is under the old top is the real question. Exposed structure means the back edge is not a straight line at all, and a scribe of fifteen or twenty millimetres across a run is normal. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. A straight swap is the exception in an older room.

03

Do you have trouble getting long pieces into Smithfield kitchens?

A car that answers every floor button pressed while a piece is standing in it needs to be held on the key, and the key usually lives at a desk that wants notice. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Disconnection happens before the old top is lifted, not during. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The old tops leave in one movement rather than piece by piece.

04

Do you get much worktop replacement work in Smithfield?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop fabrication and worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. The flat earns nothing while it sits empty. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. The carcasses have to be sound, because stone is several times the weight of what is coming off. Same day, because the void is the whole budget.

05

What decides the price of a worktop in Smithfield?

Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Same shape, different cut list. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

What do I need to sort out first?

A deep scribe comes out of the nest, so how far the stone has to be relieved changes which part of the slab the piece is cut from. This is the commonest reason a replacement turns out to need more than a straight swap. The wall has not moved, and neither has the problem. Book the goods lift and loading bay for the day, clear a straight route through the open plan, and have a plumber on hand for the island services coming up through the floor. A let property is specified for durability and for a fixed window, and both of those are legitimate reasons to choose differently. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Notice goes out before the crew is booked.

07

What if the base units are out of level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Level is checked at the template, which is the point of measuring in the room rather than off a drawing. Levelling belongs in the carcasses, on their own legs and packers. A downstand over a run caps wall unit height before it caps anything else, and the splashback then takes its height from the steel rather than from the units. We would rather find it at template than on the morning, which is why the templater looks behind the units. Packing the carcasses is part of the replacement.

08

Is removal and disposal included on a Smithfield job?

Taking the old tops off and disposing of them is its own line on the quote rather than something folded into the stone price. On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The carcasses stay put. Only the surface changes. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. Where the van must move, the waste goes on first.

09

Which materials need sealing and which do not?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Many of these kitchens are a fitted pod dropped into open floor, so three sides are free and only the fourth is ever scribed. Where brickwork bows enough that a full-depth piece cannot go back tight, the units move forward and the front overhang changes. Sound carcasses are the one condition.

10

Is a full-height splashback practical in a Smithfield kitchen?

Both are templated after the worktop is down and settled, because they are cut to the wall itself. An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. An island pod with feeds coming up through the floor cannot be nudged, so the stone is cut to suit the island. Off in the morning, on by the afternoon.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review
★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is very practical for everyday use. Highly recommend Worktop Worx for anyone looking for quality quartz worktops.”
RO74 TVXGoogle review · Calacatta Gold
★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White

Next step

Worktop replacement in Smithfield, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.