The place
Why Smithfield is its own job
Having worked in Smithfield regularly, we already know what to check before a template is booked and a slab is ordered. The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window. Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up. Cast-iron columns in these lofts are never quite where the drawing says, so scribe the island around the column rather than trusting a plan dimension. Three to seven working days sit between the template and the fit, and everything difficult gets solved in that gap.

