Skip to content

City of London · EC2Y

Splashbacks and upstands in Barbican

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Barbican kitchens

What the kitchens here are actually like

1960s-70s Grade II listed concrete estateterrace block flattower block flatmews and podium-level maisonette

Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.

Chamberlin Powell and Bon designed the kitchens as compact service rooms, so the standard flat has a galley of roughly 2.2-3m against one wall with a fixed extract duct and, in many types, a serving hatch to the dining area. Because the estate is listed the layout largely stays as built, so most work is replacing tired tops with new stone cut to the original footprint, sometimes squaring off where a hatch has been closed up. Do a full dry run of the route from car park lift to flat door before ordering, because the Barbican's walk-in is longer and more awkward than any staircase in the City. Lift cars in the residential cores are small with low ceilings, so anything over about 2.2m has to be assessed against the specific core before you cut.

Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Cut from the same slab run as the tops.

The stock behind these kitchens runs to 1960s-70s Grade II listed concrete estate, terrace block flat, tower block flat and mews and podium-level maisonette. They are not interchangeable, and a worktop finds the differences quickly.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Essex patch. Fitted 3–7 working days from template.

ex-local-authority flats and estates

The shape of the run

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted.

ex-local-authority flats and estates

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

ex-local-authority flats and estates

The building, and what it does to the job

Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Cut from the same slab run as the tops.

ex-local-authority flats and estates

Getting stone into the room

There is no vehicle access to the podium at all - you park in one of the estate car parks below, then use a car park lift and walk the highwalks and internal corridors, which can be several hundred metres with multiple fire doors and level changes.

Access

Getting stone into a Barbican kitchen

There is no vehicle access to the podium at all - you park in one of the estate car parks below, then use a car park lift and walk the highwalks and internal corridors, which can be several hundred metres with multiple fire doors and level changes. Lift cars in the residential cores are small with low ceilings, so anything over about 2.2m has to be assessed against the specific core before you cut.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Barbican is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Barbican

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Barbican?

Yes. Barbican is on the patch, and the postcodes we work here are EC2Y. It is run from the Essex side, covering Essex & East London. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Barbican change how worktop splashbacks & upstands works?

Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Decided before fabrication starts. Do a full dry run of the route from car park lift to flat door before ordering, because the Barbican's walk-in is longer and more awkward than any staircase in the City.

How does the stone actually reach a kitchen in Barbican?

There is no vehicle access to the podium at all - you park in one of the estate car parks below, then use a car park lift and walk the highwalks and internal corridors, which can be several hundred metres with multiple fire doors and level changes. Lift cars in the residential cores are small with low ceilings, so anything over about 2.2m has to be assessed against the specific core before you cut. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. That is agreed at template, not on fitting day. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Do you do much worktop splashbacks & upstands around Barbican?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

Why do two Barbican kitchens the same size price differently?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in Barbican, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398