City of London · EC4M
Splashbacks and upstands in St Paul's
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
St Paul's kitchens
What the kitchens here are actually like
Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.
The handful of residential flats here sit above shops and offices in postwar and modern blocks, so kitchens are compact open-plan arrangements of 2.6-3.2m with an integrated appliance stack and no room for an island. Ceiling voids carry a lot of services, which means bulkheads over the run and wall cupboards that stop short - stone upstands and a full-height splashback fill the gap neatly.
Stepped and setted paving around the cathedral will jar a trolley badly, so carry the last stretch on a frame rather than wheeling it over the flags. The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours.
The room is genuinely square and the units are plumb, so the visit is more about the building than about the kitchen. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant — but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. The wall makes that decision, not the brochure.
What we are usually templating in is postwar reconstruction block with flats above, modern apartment over retail, 1960s-80s commercial building converted to residential and small conversion flat. Each of those behaves differently once the old top comes off.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the Essex patch. Fitted 3–7 working days from template.
post-war terraces and 1960s housing
What gets asked for here
This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.
post-war terraces and 1960s housing
Getting stone into the room
Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged.
Access
Getting stone into a St Paul's kitchen
The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Essex patch
St Paul's is worked from our Essex run, covering Essex & East London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in St Paul's
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in St Paul's, or just list it?
Yes. St Paul's is on the patch, and the postcodes we work here are EC4M. It is run from the Essex side, covering Essex & East London. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in St Paul's?
Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. The wall makes that decision, not the brochure. Stepped and setted paving around the cathedral will jar a trolley badly, so carry the last stretch on a frame rather than wheeling it over the flags.
Is access a problem in St Paul's?
The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours. The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. That is agreed at template, not on fitting day. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop splashbacks & upstands common in St Paul's?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Where kitchens turn over between tenancies the priority is a surface that survives a decade of being treated as a chopping board. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day.
What decides the price of a worktop in St Paul's?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Access in a tenanted flat depends on the tenant, so the template and fitting dates are agreed with whoever actually holds the keys. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.
Related
More around St Paul's
Other work we do in St Paul's
Next step
Splashbacks and upstands in St Paul's, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.