City of London · EC4V EC4Y

Splashbacks and upstands in Blackfriars

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Blackfriars kitchens

The kitchens we meet in Blackfriars

The reason splashback and upstand work in Blackfriars is quoted per kitchen rather than per metre comes down to the range of rooms these worktops end up in. Riverside flats put the living space against the glazing and the kitchen against the core, so the run is 3-3.5m with a peninsula facing the river and one polished exposed end on show. Older commercial conversions here have thick masonry cross-walls, meaning the kitchen sits in a defined bay and long single pieces are actually easier than in a modern open plan. Send through a photograph or two and the rough run length. We will tell you what you are probably dealing with.

Underfloor heating in a screed rules out fixing into the floor and rules out standing anything heavy on a single point. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Sockets cut in the shop, not on site.

Sprinkler heads and extract ducts are coordinated into the ceiling, so an extractor over an island goes where the services already allow. Panels come off the same slab as the tops so the colour and the movement carry from horizontal to vertical. A bowed wall is what decides between an upstand and a panel.

The stock behind these kitchens runs to riverside apartment block, 1990s-2000s conversion of commercial building, modern mixed-use tower and small period flat above offices. The one you have sets the piece length before the kitchen does.

Undermounted sink cut-out in a quartz worktop
  • riverside apartment block
  • 1990s-2000s conversion of commercial building
  • modern mixed-use tower
  • small period flat above offices

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
Borough
City of London
Postcodes
EC4V, EC4Y
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why Blackfriars is its own job

Before we quote a length in Blackfriars we want to know how the stone gets in and what it will be sitting against. Queen Victoria Street and the Embankment approaches are red route and bus-heavy with no stopping, so unloading is into a building's own basement bay or a booked side-street window, not the main road. Most buildings run a security desk with contractor sign-in, and the goods lift needs booking a few days ahead. Riverside peninsulas are seen from three sides, so pay for the extra polished edge and end profile rather than leaving a sawn edge facing the room. Everything above is looked at on the free design visit, and none of it is charged for until the template.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

A full-height sheet must live with everything already on that wall, the extractor and its bracket included, because it is machined to fit round them and cannot be eased afterwards. A window sill sitting lower than the surface settles the argument on its own: the strip runs into the reveal, returns, and the wall above is left alone. Developer kitchens arrive with a laminated or tiled finish already on that wall, and it has to come off before stone can be templated against it. Stone behind the hob, not grout.

Sink cut-outs See the options

The money

What it costs in Blackfriars

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. The return into the wall and the free end are two different details on one piece, and both are machined rather than cut square. Material runs from £110 to £550 per square metre supply only, and the template, fabrication and fitting are quoted on their own lines. Priced by the edge and the openings, not the wall.

Victorian and Edwardian terraces

The shape of the run

Peninsula tops are often the longest single piece in the kitchen, so if anything in the layout is going to force a second slab it is generally this one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Panel height is set by the extractor.

Victorian and Edwardian terraces

What Blackfriars asks for

This one is uncommon here and there is no advantage in pretending otherwise. Worktop installation, worktop fabrication and worktop replacement come up far more often. Quoting, fabrication and fitting are identical either way.

Victorian and Edwardian terraces

Blackfriars in the housing figures

Taken across Blackfriars and the roads either side of it, converted and purpose-built flats make up most of the stock. A tall panel has to be carried on edge and cannot be tilted to clear a turn, so it is usually the splashback that will not go in, not the top. The joint line is planned, not discovered.

Access

Getting stone into a Blackfriars kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

City of London patch

Blackfriars is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Blackfriars

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Blackfriars, or is it a subcontractor?

Yes. Blackfriars is on the patch, and the postcodes we work here are EC4V, EC4Y. It is worked on our City of London run, along with the rest of the Square Mile. Where a marked loading box sits on the red route the stop is legal but timed, so the unload runs as one movement with every hand on it. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Standing a panel on the pavement is the last resort. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

What should I expect from worktop splashbacks & upstands in a Blackfriars kitchen?

A riverside block is a managed building with a booked goods lift, a loading bay and a concierge, and all three have to line up on the same day. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Dry lining behind a panel needs a fixing plan of its own. A lightweight stud partition will not carry a breakfast bar or a peninsula end, and stone finds that out faster than laminate ever did. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The sill caps the upstand before anything else does.

03

How would you get a worktop into a property in Blackfriars?

Goods lifts and passenger lifts fail differently: one has a rated load that matters, the other has a door aperture that matters more. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The frame they travel in needs the clearance as well. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged.

04

Does Blackfriars actually ask for worktop splashbacks & upstands?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation, worktop fabrication and worktop replacement. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Less to clean, for whoever cleans it. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Panels for every unit, cut in one go.

05

What moves the number on a quote around here?

A peninsula is an island with one end tied to a run, which means the join between them has to be planned rather than allowed to happen. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Every internal corner is two pieces, not one. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

What state does a Blackfriars kitchen have to be in before you template?

Dot-and-dab plasterboard sounds solid and is hollow behind, so anything fixed through it has to hit a dab or a batten rather than a void. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A downstand sets the panel height, not the wall units. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Some doors in a building need a consent letter and some need nothing at all, so the first question is which arrangement applies here rather than which one is usual. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. What repeats across flats is recorded once and repeated.

07

How do you cut out for an undermounted sink?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. The sink, tap and hob have to be physically in the room at the template, not merely ordered, because the cut-out is machined to the item itself. The free end is what needs deciding early: square edge, mitred apron down the end, or a full waterfall to the floor, and a waterfall is cut in sequence off the same part of the slab. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Long walls break where the worktop breaks.

08

When do I pay for a Blackfriars worktop?

The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. Taped internal angles in plasterboard belly at the corner, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Behind the boxing it becomes two pieces.

09

Do I have to get rid of the old tops myself in Blackfriars?

The carcasses stay put. Only the surface changes. On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The tap and waste have to be disconnected by a plumber before we start and reconnected once the stone is in. The van is not staying on a main road for the day, so once the stone is off it goes and parks properly somewhere else. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. One trip is always better than three.

10

What happens if a piece is damaged on the fitting day?

Chips at an edge or a corner are the usual form, because that is where stone is least supported. Door frames and the stair route are protected too, since most contact happens on the way in. The workmanship guarantee runs 5 years on every kitchen we fit. Handrails, mirrors and a sloping ceiling panel all eat into the usable diagonal, and none of them appear on a lift specification sheet. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. A vertical break is easier to live with than a cracked panel.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Splashbacks and upstands in Blackfriars, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.