City of London · EC2V

Splashbacks and upstands in Cheapside

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Cheapside kitchens

The kitchens we meet in Cheapside

Homeowners tend to arrive at splashback and upstand work in Cheapside with a picture saved on a phone and no clear sense of what their own kitchen will allow. Residential units above the Cheapside retail frontage are modern and tightly planned, with a galley or L of 2.8-3.4m and a breakfast bar overhang of 250-300mm that needs proper bracketry rather than relying on the stone. New stock came with composite tops that owners are now upgrading to quartz, keeping the existing undermount sink position and tap holes. Whichever it is, the process below is the same, and the figure you get after templating is fixed.

The rear wall of the addition carries both the back door and the window, which leaves very little unbroken wall for a run to sit against. Height is set off the units and the hob, not off the tile line that was there before. Twenty millimetres of packing behind a panel is not a fix.

A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. A full-height panel in a chimney recess is templated as a trapezium, since that recess is square in neither direction. Decided before fabrication starts.

The housing behind these kitchens is modern apartment above retail, postwar block with upper-floor flats, office conversion and mixed-use development. What is behind the plaster is different in each, and it matters at fixing.

Mitred waterfall edge detail on a quartz island
  • modern apartment above retail
  • postwar block with upper-floor flats
  • office conversion
  • mixed-use development

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
Borough
City of London
Postcodes
EC2V
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why Cheapside is its own job

What we look for on a survey in Cheapside is the sort of thing that never appears on a kitchen plan. Cheapside itself has bus lanes and daytime loading restrictions, and the residential entrances are usually a discreet side door off a neighbouring lane rather than on the main frontage. Retail servicing takes priority in the shared basement bays, so residential deliveries get an off-peak slot, generally mid-morning or after the shops shut. Overhangs on these breakfast bars need steel flat bar, not faith - 30mm quartz unsupported past about 300mm will crack at the sink corner sooner or later. Once the template is signed off the price is fixed. It does not move because the job turned out fiddly.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

An upstand is a low strip of the same material standing on the worktop against the wall, usually about a hundred millimetres; a splashback carries on up to the wall units or the extractor. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. The panel clears the extractor before it is machined.

Waterfall ends See the options

The money

What it costs in Cheapside

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. It behaves like half an island on the yield and all of one on the edge profile. Material is £110 to £550 per square metre supply only, with the batch and the slab size sitting behind that variation, and the workshop time quoted apart from it. Priced by the edge and the openings, not the wall.

new-build flats and apartments

The building, and what it does to the job

An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Upstands sit tight because both edges are cut.

new-build flats and apartments

What Cheapside asks for

Around here this is occasional rather than routine. The routine ones are worktop replacement and worktop installation. That is a comment on the buildings and on nothing else.

new-build flats and apartments

The shape of the run

A peninsula is an island with one end tied to a run, which means the join between them has to be planned rather than allowed to happen. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Upstands follow the return round the corner.

Access

Getting stone into a Cheapside kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

City of London patch

Cheapside is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Cheapside

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Cheapside, or is it a subcontractor?

Yes. Cheapside is on the patch, and the postcodes we work here are EC2V. It is worked on our City of London run, along with the rest of the Square Mile. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What should I expect from worktop splashbacks & upstands in a Cheapside kitchen?

The flat entrance door and the internal doorways are usually tighter than the communal stairs, which is the opposite of what most people assume. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Height, returns and sockets, all settled on site. Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A breast return is scribed on three edges.

03

How would you get a worktop into a property in Cheapside?

Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. They stand upright in the van and stay upright until they are on the wall. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. One trip is always better than three.

04

Do you get much worktop splashbacks & upstands work in Cheapside?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop replacement and worktop installation. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. Where a single building holds several small kitchens, the work arrives as one job rather than four, and it should be cut off the same slab run so the batches genuinely match. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Cut now, stored for the next void. Small kitchens in a shared house are all short runs and tight cut-out spacing, which is more bench work per square metre than one large kitchen would be. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, or the join will say so.

05

What moves the number on a quote around here?

The free end is what needs deciding early: square edge, mitred apron down the end, or a full waterfall to the floor, and a waterfall is cut in sequence off the same part of the slab. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The hob panel is sized after the extractor, not before. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What state does a Cheapside kitchen have to be in before you template?

Exposed structure means the back edge is not a straight line at all, and a scribe of fifteen or twenty millimetres across a run is normal. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Set it proud on a subframe and the gap becomes deliberate. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. One staircase can serve an owner on the first floor and a managed tenancy on the second, so the access arrangement changes at every landing while the building stays the same. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. An owner can wait for it; a void period cannot.

07

Which materials need sealing and which do not?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. A hundred millimetres covers more than it looks.

08

What happens if a piece is damaged on the fitting day?

The workmanship guarantee runs 5 years on every kitchen we fit. A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. Our own installers do the carry, so there is nobody in the middle to argue with about it. Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A door frame catches a tall panel long before a short one.

09

What if the base units are out of level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. A deep scribe comes out of the nest, so how far the stone has to be relieved changes which part of the slab the piece is cut from. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. An upstand rides what a panel exposes.

10

Is a full-height splashback practical in a Cheapside kitchen?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. Lease conditions and the other flats in the building decide when noisy work can happen, so the fitting day has a start and a finish that are not ours to set. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. The plaster behind it is the real question.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Splashbacks and upstands in Cheapside, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.