City of London · EC2V

Worktop replacement in Cheapside

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Cheapside kitchens

The kitchens we meet in Cheapside

You can plan worktop replacement in Cheapside from a floor plan, but the plan and the room have a habit of disagreeing once the tape comes out. Residential units above the Cheapside retail frontage are modern and tightly planned, with a galley or L of 2.8-3.4m and a breakfast bar overhang of 250-300mm that needs proper bracketry rather than relying on the stone. New stock came with composite tops that owners are now upgrading to quartz, keeping the existing undermount sink position and tap holes. We would rather find an out of square wall at survey than on fitting day, so the survey is thorough and unhurried.

Where the walls have been dry-lined over the old lath there is a void behind the board and no solid fixing until a batten is found. A kitchen that has stood twenty years has settled into a shape of its own, and the new stone is cut to that shape rather than the original one. A single day, planned properly.

Ceilings in the principal rooms are three metres or more, so a full-height panel behind a hob is a taller piece here than the same kitchen would need anywhere else. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Plaster comes away with the old upstands more often than not.

What we are measuring in, mostly, is modern apartment above retail, postwar block with upper-floor flats, office conversion and mixed-use development. The template reads them differently even where the layout looks identical.

Polished stone edge profile close up
  • modern apartment above retail
  • postwar block with upper-floor flats
  • office conversion
  • mixed-use development

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
Borough
City of London
Postcodes
EC2V
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why Cheapside is its own job

The practical side of a worktop in Cheapside is settled long before anyone chooses a colour, and it is worth saying out loud. Cheapside itself has bus lanes and daytime loading restrictions, and the residential entrances are usually a discreet side door off a neighbouring lane rather than on the main frontage. Retail servicing takes priority in the shared basement bays, so residential deliveries get an off-peak slot, generally mid-morning or after the shops shut. Overhangs on these breakfast bars need steel flat bar, not faith - 30mm quartz unsupported past about 300mm will crack at the sink corner sooner or later. None of that changes the price once the template is done. The number we agree at the template is the number you pay.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You end up with the same kitchen and a completely different surface, in one fitting day rather than a kitchen refit that empties the room for a fortnight.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. What comes off is loaded into the van and gone the same day, and its weight is costed before the work starts rather than after. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. Sink and hob settled before the templater attends.

Edge profiles See the options

The money

What it costs in Cheapside

The saving on a replacement is that you keep the units. The risk is what is found under the old top, and that is checked before a deposit rather than after. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. For a rough sense of the material, £110 to £550 per square metre supply only is the honest span. Treat it as one line of a quote that will carry several more. Priced on the kitchen you have, not the one on the plan.

new-build flats and apartments

The building, and what it does to the job

A brick pier standing into the run divides it in two, and the join goes against the pier where a clear wall would have needed no join at all. Where the strip-out and the template happen on the same visit it gets measured properly, with the old top already off. It was there long before we were.

new-build flats and apartments

What Cheapside asks for

First by volume on this patch, with worktop installation some distance back.

new-build flats and apartments

The carry, and what it rules out

A bay shared across a parade of shops turns over all day, so the arrival time matters more than the length of the booking does. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Old tops out and new stone in, both through the same gap.

Access

Getting stone into a Cheapside kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

City of London patch

Cheapside is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Cheapside

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Cheapside, or just list it?

Yes. Cheapside is on the patch, and the postcodes we work here are EC2V. It is worked on our City of London run, along with the rest of the Square Mile. Building management is often the real gate rather than the bay itself, since the barrier, the shutter and the lift each need someone with a fob. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste run is planned, not improvised. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about Cheapside buildings that catches worktop replacement out?

A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. The building has kept moving; the new template catches up. Where the structure cannot be cut into, the stone is relieved instead, and a relief that deep changes both the yield off the slab and how the piece is handled. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The old top hid it. The drawing will not.

03

What do you check about the route into a Cheapside property?

A level threshold with hard standing outside it is the one arrangement where a full run goes in without a single re-grip. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Timing the two carries is most of the planning. Time-limited bays are camera-enforced across a lot of managed estates, so the unload runs to the clock and the van moves off afterwards. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. It is a full day at the kerb, not a delivery.

04

Is worktop replacement what Cheapside rings about?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Rooms in a shared house are let individually, so the work has to be done around whoever is still living in the building. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project. A landlord ordering several kitchens at once is buying a specification once and then repeating it, so the early decisions are worth taking slowly. Old tops out in the morning, new stone down and sealed the same afternoon. A void week is the entire schedule.

05

Why do two Cheapside kitchens the same size price differently?

Peninsulas frequently land on a lightweight partition or on units that were never fixed down, and stone needs proper support under it before it goes on. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The sink is chosen before the cut list is set. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What has to be finished before you can template?

An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. This is the commonest reason a replacement turns out to need more than a straight swap. Nothing about it is a discovery on fitting day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. One staircase can serve an owner on the first floor and a managed tenancy on the second, so the access arrangement changes at every landing while the building stays the same. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Strip-out and fit inside one access window.

07

Is templating a separate visit from fitting?

A template on a normal kitchen takes two to three hours in the room. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. The same firm templates and fits. Nobody else is brought in to install. Chimney breasts are often taken out at ground level and left standing above, so the middle of the run is newer wall than the two ends of it. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. What comes off tells you what goes on.

08

How many joins will a Cheapside kitchen need?

Slabs come in finite sizes, so a long run needs a join whatever the room looks like. A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. Because a peninsula is seen from both sides, the underside of any overhang gets the same edge treatment as the top, which is easy to leave out of a spec. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Joins move onto the gables this time round.

09

What happens to the worktop that comes off?

Disposal means it goes in the van, not into the garden to wait for a collection. An old stone top is heavier coming out than the new one is going in, and leaves in sections. The sink and hob are lifted out with the old top and kept aside if you are reusing them. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. Two loads, one space, one day.

10

Is the quote a fixed price or an estimate?

Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate was scribed thin. Stone cannot be.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review

Next step

Worktop replacement in Cheapside, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.