City of London · EC4M

Worktop replacement in St Paul's

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

St Paul's kitchens

The kitchens we meet in St Paul's

Pricing replacements in St Paul's has less to do with the postcode than with what the kitchen turns out to be once someone has measured it. The handful of residential flats here sit above shops and offices in postwar and modern blocks, so kitchens are compact open-plan arrangements of 2.6-3.2m with an integrated appliance stack and no room for an island. Ceiling voids carry a lot of services, which means bulkheads over the run and wall cupboards that stop short - stone upstands and a full-height splashback fill the gap neatly. You will see the drawing before anything is machined, and if it is wrong on paper it gets changed on paper.

The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. A single day, planned properly.

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. Cam-lock carcasses are re-tightened and screwed together before stone goes on, because chipboard boxes were built for a lighter top. The old top hid it; the new one will not.

The stock we template in here is postwar reconstruction block with flats above, modern apartment over retail, 1960s-80s commercial building converted to residential and small conversion flat. The one you have sets the piece length before the kitchen does.

Undermounted sink cut-out in a quartz worktop
  • postwar reconstruction block with flats above
  • modern apartment over retail
  • 1960s-80s commercial building converted to residential
  • small conversion flat

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
Borough
City of London
Postcodes
EC4M
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why St Paul's is its own job

A plan drawn off a floor plan will not tell you what a fit in St Paul's actually involves, so we come and look. The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours. Stepped and setted paving around the cathedral will jar a trolley badly, so carry the last stretch on a frame rather than wheeling it over the flags. The visit that sorts all this out is free, and there is nothing to pay until we template.

The work

What worktop replacement involves

A replacement is quoted the same way as a new kitchen: material per square metre supply-only, with templating, fabrication and fitting each written on their own line. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement is two jobs in one visit: taking the old surface out, and setting the new one on what is left behind. Sink and hob are settled before the templater attends, because a change to either changes the cut-outs and cannot be added later. Building management wants the removal notified as much as the delivery, and both belong in the same booking. The old surface leaves in our van, not your garden.

Sink cut-outs See the options

The money

What it costs in St Paul's

What the old worktop was fixed to matters more to the price than what goes on top of it. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. The stone itself is £110 to £550 per square metre supply only; everything done to it is priced separately and shown separately. What is found underneath is raised before it is charged.

post-war terraces and 1960s housing

St Paul's in the housing figures

In this corner of the borough, upper-band homes are rare in the stock. Void periods set the date more often than taste does. The units stay and only the surface changes, so the whole job turns on what the carcasses will take. Out in the morning, sealed by the afternoon.

post-war terraces and 1960s housing

What St Paul's asks for

A managed portfolio tends to repeat one specification across every flat, which keeps later repairs and replacements simple to order. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A builder-finish kitchen upgrades in a morning.

This is the job the local stock asks for first, ahead of worktop installation and worktop splashbacks & upstands.

Access

Getting stone into a St Paul's kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

City of London patch

St Paul's is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in St Paul's

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in St Paul's, or just list it?

Yes. St Paul's is on the patch, and the postcodes we work here are EC4M. It is worked on our City of London run, along with the rest of the Square Mile. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old tops out and new stone in, both through the same gap. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in St Paul's do to worktop replacement?

Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The room itself is the easy part: walls are plumb, corners are square and the floor is flat, so scribes are minimal and joins can be tight. Same units, straighter line, better surface. A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. It was there long before we were.

03

Do you have trouble getting long pieces into St Paul's kitchens?

Concierge buildings want the goods entrance, a booked lift and proof of insurance, all of which is straightforward when it is asked for a week out. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Old pieces are carried out before new ones are carried in. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The waste run is planned, not improvised.

04

Is worktop replacement what St Paul's rings about?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation and worktop splashbacks & upstands. Damage in a let flat is settled as a deposit deduction, so a surface that can be repaired in place is worth more than one that has to be replaced whole. The carcasses have to be sound, because stone is several times the weight of what is coming off. The doors are staying, so the colour answers to them. The person choosing the worktop is not the person using it, and that shifts the balance from appearance towards running cost. Old tops out in the morning, new stone down and sealed the same afternoon. Between tenancies is the only window there is.

05

What decides the price of a worktop in St Paul's?

A galley that is also the route to the back door is a corridor first and a kitchen second, and what the shape can take is set by the traffic going through it. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The shape is measured again, not copied off the old top. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

What do I need to sort out first?

Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. We would rather find it at template than on the morning, which is why the templater looks behind the units. The old top hid it. The drawing will not. Book the service lift, loading bay and concierge access for the full day, and confirm the building's permitted working hours in writing. Nobody reseals a worktop annually in a let property, so a material that depends on being resealed is the wrong specification however well it photographs. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Two visits mean two people taking a day off.

07

Will I be able to see the joins?

Join count and position are settled from the template drawing rather than improvised on the fitting day. A join sits over a cabinet gable. It never spans a gap and never runs through a cut-out. Join count is a question about slab size and run length, nothing else. Two runs of similar length nest as a pair off one slab, and if one of them grows by a few hundred millimetres the pair stops fitting and the yield changes for both. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Laminate hides what the gables are really doing.

08

What do you need from me for the sink and hob cut-outs?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. Where the aisle is too tight the usual answer is a reduced-depth top on one side, and a 500mm run is a different cut, a different sink and a different drainer to a 600mm one. The shape is already there to be measured, which makes the template straightforward and leaves the strip-out as the part that actually needs planning. A corner that was butted can be mitred this time.

09

Do I have to get rid of the old tops myself in St Paul's?

Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. The sink and hob are lifted out with the old top and kept aside if you are reusing them. The template can be taken with the old top still down, which is why one visit covers both. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. It is a full day at the kerb, not a delivery.

10

What is actually on a St Paul's worktop quote?

Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. The edge profile is its own line, so a shaped edge and a square one are two different figures. What is quoted is what the drawing says, and the figure does not move unless the drawing does. A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. Nothing about it is a discovery on fitting day.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review

Next step

Worktop replacement in St Paul's, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.