City of London · EC4Y
Splashbacks and upstands in Temple
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Temple kitchens
What the kitchens here are actually like
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.
Residential sets within the Inns have small kitchens fitted into rooms that were never designed for them, typically a 1.8-2.6m run against a chimney breast or under a sash window, with wiring and plumbing surface-run in trunking. Everything is a careful retrofit rather than a design exercise, and stone is chosen for a hard-wearing surface in a heritage room rather than for a statement island.
Worn stone stair treads are slippery and uneven, and a two-man carry on those with a slab on edge is where people get hurt - use a proper frame and take the extra body. Internally it is cobbles and setts in the courts, narrow historic stairs with worn stone treads, and listed joinery you cannot unhang. The Temple is a private, gated precinct with controlled vehicle entry, porters and its own rules, so access has to be arranged through the Inn's estates office rather than turned up to.
Edwardian terraces are wider and taller than the Victorian houses next to them, so the kitchen usually takes a full-width rear room rather than a narrow outrigger. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Cut from the same slab run as the tops.
What turns up on the job sheets is Inn of Court chambers building with residential sets, listed brick range around a court, postwar rebuild in period style and small flat within a legal building. Each of those behaves differently once the old top comes off.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the Essex patch. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
What gets asked for here
Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.
Victorian and Edwardian terraces
The building, and what it does to the job
Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail.
Access
Getting stone into a Temple kitchen
The Temple is a private, gated precinct with controlled vehicle entry, porters and its own rules, so access has to be arranged through the Inn's estates office rather than turned up to. Internally it is cobbles and setts in the courts, narrow historic stairs with worn stone treads, and listed joinery you cannot unhang.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Essex patch
Temple is worked from our Essex run, covering Essex & East London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Temple
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Temple?
Yes. Temple is on the patch, and the postcodes we work here are EC4Y. It is run from the Essex side, covering Essex & East London. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Temple change how worktop splashbacks & upstands works?
Half-landings mean the back of the house sits at a slightly different level from the front, and a knocked-through kitchen crosses that line. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here — it rides the bow and hides the junction the worktop can never close on its own. Cut from the same slab run as the tops. Worn stone stair treads are slippery and uneven, and a two-man carry on those with a slab on edge is where people get hurt - use a proper frame and take the extra body.
How does the stone actually reach a kitchen in Temple?
The Temple is a private, gated precinct with controlled vehicle entry, porters and its own rules, so access has to be arranged through the Inn's estates office rather than turned up to. Internally it is cobbles and setts in the courts, narrow historic stairs with worn stone treads, and listed joinery you cannot unhang. Where the parking court sits behind the block the carry crosses open ground and gets boarded, because loaded trolleys and block paving do not agree. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop splashbacks & upstands common in Temple?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Landlord work is scheduled around void periods, so the whole thing is a fixed window and the template date matters as much as the fitting date. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Sockets final before template.
Why do two Temple kitchens the same size price differently?
Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.
Related
More around Temple
Other work we do in Temple
Next step
Splashbacks and upstands in Temple, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.