City of London · EC4Y

Worktop replacement in Temple

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Temple kitchens

The kitchens we meet in Temple

The replacements we are called out to in Temple tend to arrive with a history, and reading that history is half of getting the measurements right. Residential sets within the Inns have small kitchens fitted into rooms that were never designed for them, typically a 1.8-2.6m run against a chimney breast or under a sash window, with wiring and plumbing surface-run in trunking. Everything is a careful retrofit rather than a design exercise, and stone is chosen for a hard-wearing surface in a heritage room rather than for a statement island. Ask for the design and quotation visit. It is free, it carries no obligation, and it settles all of this properly.

An under-stairs cupboard eats one end of most of these kitchens, and the run stops at a door that has to keep opening. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. An old kitchen has moved, and the stone is cut to that.

The original larder or store cupboard usually survives in a corner, and that alcove is deeper than the units and squarer than the walls around it. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. What is behind the old splashback decides the new one.

The housing behind these kitchens is Inn of Court chambers building with residential sets, listed brick range around a court, postwar rebuild in period style and small flat within a legal building. The floor datum is the thing that changes most between them.

Mitred waterfall edge detail on a quartz island
  • Inn of Court chambers building with residential sets
  • listed brick range around a court
  • postwar rebuild in period style
  • small flat within a legal building

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
Borough
City of London
Postcodes
EC4Y
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why Temple is its own job

When people ask what is different about a worktop job in Temple, the answer is in the route and in the walls. The Temple is a private, gated precinct with controlled vehicle entry, porters and its own rules, so access has to be arranged through the Inn's estates office rather than turned up to. Internally it is cobbles and setts in the courts, narrow historic stairs with worn stone treads, and listed joinery you cannot unhang. Worn stone stair treads are slippery and uneven, and a two-man carry on those with a slab on edge is where people get hurt - use a proper frame and take the extra body. That is the sort of thing we come and look at in Temple before we quote, not after you have committed.

The work

What worktop replacement involves

The service assumes the units stay in place, so it is not a route to changing the layout. Moving a sink or a run of cabinets makes it a kitchen job with a worktop in it. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement is the job where the tiling, the sink and the wall behind them all get settled at the same time as the worktop. Brackets, battens and any timber sub-frame come out with the top, and what was screwed into the wall gets filled. Original cabinets are long gone here, and what comes out is a flat-pack run that has spent fifteen years on a cold solid floor. Support goes in before the weight does.

Waterfall ends See the options

The money

What it costs in Temple

A replacement is priced against the kitchen that is there now, and the carcasses are the one condition that can change it. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. Priced on the kitchen you have, not the one on the plan.

Victorian and Edwardian terraces

What Temple asks for

The surveys on these streets come back to this more often than to worktop splashbacks & upstands.

Victorian and Edwardian terraces

The carry, and what it rules out

The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. Half a day can go on the strip-out where the way in is tight.

Victorian and Edwardian terraces

The shape of the run

An island carries its own edge detail all the way round, so a mitred 100mm apron on four sides is four mitres cut, bonded and polished before the piece ever leaves the bench. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The old cut-outs prove nothing.

Access

Getting stone into a Temple kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

City of London patch

Temple is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Temple

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Which postcodes do you cover around Temple?

Yes. Temple is on the patch, and the postcodes we work here are EC4Y. It is worked on our City of London run, along with the rest of the Square Mile. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste leaves with us, so the van has to still be there. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop replacement in a Temple kitchen?

Rear rooms of this date have a wide sash or a pair of garden doors, so a good deal of the wall the run wants is glass. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. A new top on a settled run needs the run corrected first. Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. This is the commonest reason a replacement turns out to need more than a straight swap. A filler strip is evidence, not decoration.

03

How would you get a worktop into a property in Temple?

Estate roads are often too tight for a long-wheelbase van to turn, so the carry starts a good deal further from the door than a map suggests. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Nothing new comes down a hall still full of old top. A skip, a delivery lorry or a run of scaffolding takes the frontage the van needed, so the street is worth a look the day before rather than on the morning. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Both loads want the same few metres of kerb.

04

Is worktop replacement the job you do most in Temple?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands. The person choosing the worktop is not the person using it, and that shifts the balance from appearance towards running cost. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Between tenancies is the only window there is. Where kitchens turn over between tenancies the priority is a surface that survives a decade of being treated as a chopping board. Old tops out in the morning, new stone down and sealed the same afternoon. One plot replaced years on, matched or otherwise.

05

What moves the number on a quote around here?

Waterfall ends are cut in sequence off the length either side of the top so the vein carries down the leg, and that sequence is gone the moment a piece has to be recut. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Any overhang gets underpinned first. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

What state does a Temple kitchen have to be in before you template?

Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. We would rather find it at template than on the morning, which is why the templater looks behind the units. The stack was boxed in after the kitchen went in. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Whoever lives there hears the timing first.

07

How much upkeep is a stone worktop?

No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Topping a seal up is a wipe-on job with a cloth. Internal walls are lath on timber studs while the flank walls are brick, so two walls in the same kitchen take a fixing completely differently. Carcasses are checked for square and fixed back before a stone top goes on them. The fabric gets checked while it is open.

08

What happens between the template and the fitting day?

The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. The design and quotation visit comes first. It is free and carries no obligation. The template produces a drawing, and the workshop cuts to that drawing once you agree it. Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The old top is heavy waste, and booked as waste.

09

Will I be able to see the joins?

Each join is an item on the drawing, so the layout and the figure move together. Veining carries through a join where both pieces come off the same slab, which is decided at nesting. A join sits over a cabinet gable. It never spans a gap and never runs through a cut-out. Everything on an island is fed from underneath, extraction, a socket run, a hob and sometimes a waste, and each of them wants its hole before the top is bonded down. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. The shape is measured again, not copied off the old top.

10

What do you need from me for the sink and hob cut-outs?

A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. A tap under a window board still needs room for its handle to lift, which is checked at the template. Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. The shape is already there to be measured, which makes the template straightforward and leaves the strip-out as the part that actually needs planning. Laminate hides what the gables are really doing.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Worktop replacement in Temple, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.