Lewisham · SE8 SE4

Splashbacks and upstands in St Johns

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

St Johns kitchens

The kitchens we meet in St Johns

Splashback and upstand work in St Johns tends to go wrong in the planning rather than in the fitting, and planning it properly means starting from the building. Modest Victorian terraces and some larger semis caught between the railway lines; kitchens are usually the back addition at 2.2m to 2.8m wide, and narrow plots limit side returns so most jobs stay inside the original footprint. Whichever it is, the process below is the same, and the figure you get after templating is fixed.

Original quarry tile is often still down under two or three later floor coverings, which is why the finished floor height is rarely what anyone expects. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Full height needs a flat wall and a finished electrician.

A soil stack is strapped to the outside of the addition wall and its branch comes through low, which settles where the sink can go before any layout is drawn. Sockets and switches are cut to measured positions with the faceplates off, not to the positions shown on a drawing. Panels expose a wall; upstands forgive one.

The stock we template in here is Victorian terrace, Victorian semi-detached villa, 1970s low-rise estate and 1990s infill. Which of those you have decides most of what follows.

Undermounted sink cut-out in a quartz worktop
  • Victorian terrace
  • Victorian semi-detached villa
  • 1970s low-rise estate
  • 1990s infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
Borough
Lewisham
Postcodes
SE8, SE4
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why St Johns is its own job

The reason we ask so much before quoting in St Johns is that a worktop cannot be trimmed to fit a surprise. Railway viaducts and changes of level carve the area into pockets with few through routes, and parking is permit-controlled; short carries, awkward navigation. Narrow plots mean side returns rarely happen, most of the work here is making a 2.4m galley work harder. Once the template is signed off the price is fixed. It does not move because the job turned out fiddly.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Where a run is longer than one sheet will cover, the break is put on a vertical that has a reason to be there, and the two edges are cut as a pair so the seam closes without filler. You end up with a wall that gets wiped down in the same pass as the worktop, because it is the same material carrying on upward rather than a different one starting.

Behind a hob the choice of material stops being about looks: a resin-based surface will mark under sustained heat where a sintered one will not. Behind a hob the panel usually rises higher than the rest of the run and stops at the extractor instead of at the units. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. One sheet, two seams, nothing to reseal.

Sink cut-outs See the options

The money

What it costs in St Johns

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. A rooflight over the run means any join is seen under raking light, which is a placement decision with a cost attached. For a rough sense of the material, £110 to £550 per square metre supply only is the honest span. Treat it as one line of a quote that will carry several more. Height is a decision with a figure against it.

Victorian and Edwardian terraces

St Johns in the housing figures

In this neighbourhood hardly anything was added between the wars, and the layouts skip from one era straight to another. Where the boiler or the flue sits in one spot house after house, the panel is drawn round it once and reused. Returns and reveals set out at finished size.

Victorian and Edwardian terraces

What St Johns asks for

The research on this patch does not put this among the three commonest jobs. Worktop replacement and worktop fabrication do. That changes how often we are here, not how the work is done.

Victorian and Edwardian terraces

The shape of the run

A single long run down one side puts every cut-out in one piece, so the sink, the hob and any drainer grooves all take material out of the same length. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces.

Access

Getting stone into a St Johns kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

St Johns is covered on our south east London run, along with the rest of Lewisham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in St Johns

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Which postcodes do you cover around St Johns?

Yes. St Johns is on the patch, and the postcodes we work here are SE8, SE4. It is worked on our south east London run, along with the rest of Lewisham. A shared-use bay allows a paid stay up to a set maximum, and that maximum is routinely shorter than the working day the job needs. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Rushing the last piece off the van is how panels break. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

What should I expect from worktop splashbacks & upstands in a St Johns kitchen?

The original scullery gully is still live in the yard outside the back door, and new waste from the sink joins a drain laid for a copper and a stone sink. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. What the wall can take decides how tall the stone goes. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Full height wants a flat wall behind it.

03

How would you get a worktop into a property in St Johns?

Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A panel that would need turning indoors is turned outside instead. Camera enforcement gives nobody the chance to explain, where an officer on foot at least sees a tail lift down and stone coming off it. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Two hands and a clear route, or it waits on the van.

04

Does St Johns actually ask for worktop splashbacks & upstands?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement and worktop fabrication. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Six kitchens, one socket layout, one panel drawing. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The annexe gets the same panel as the main run.

05

What moves the number on a quote around here?

A galley run down a side-return extension usually measures longer than a slab will give in one length, so a join is designed in from the start rather than discovered. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The run decides where that joint falls. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

What state does a St Johns kitchen have to be in before you template?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Each obstruction is another joint, and it is priced as one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. Whoever specifies it signs the drawing.

07

What happens if my units are not level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Units have to be fixed down as well as levelled. A loose carcass moves under stone. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The panel takes its height off the steel.

08

What happens if a piece is damaged on the fitting day?

Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. Floors and units are protected before anything comes through the door. A hall radiator or a coat hook at shoulder height takes a hundred millimetres off the usable width, and a hundred millimetres is often the entire margin. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. What can be got into the room decides the height above the worktop.

09

How much upkeep is a stone worktop?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. A seal is not waterproofing. It only buys time to wipe a spill up. The rear door swings inward across the end of the run, so the last few hundred millimetres of worktop are only reachable with the door shut. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Old walls lean back, and a tall panel shows it.

10

What do you need from me for the sink and hob cut-outs?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A tap under a window board still needs room for its handle to lift, which is checked at the template. Side-return kitchens are long and narrow with one outside wall, and the wall the run sits against is often the oldest, least straight surface in the house. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The panel seam sits over the worktop seam.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Splashbacks and upstands in St Johns, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.