Lewisham · SE14

Worktop fabrication in Telegraph Hill

Your slab nested, cut to the template drawing, mitred, machined and dry-assembled on the bench before anything is loaded.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Telegraph Hill kitchens

The kitchens we meet in Telegraph Hill

We plan the fabrication runs in Telegraph Hill around access, ceiling height and what the kitchen has already been through, none of which shows up in a phone call. Tall Victorian villas on a steep hill, most converted into flats. Garden-level flats have kitchens in the old lower ground with low ceilings and a lightwell, and the upper flats have kitchens in the return with a window at one end and no straight run beyond 3m. Plenty of kitchens do not match either description exactly, which is what the measured survey is there to sort out.

The range sits in a former chimney opening, so the pieces either side of it are short, unequal and cut to brickwork rather than to a module. The slab is laid out around it, so which piece comes from where is decided by the room rather than by convenience. Nothing is machined until the drawing matches the building.

A deep butler sink and a boiling tap on the same length put two heavy cut-outs within a metre of each other. The island and the back run are nested together so the movement in the stone relates across the room. A scribe of twenty millimetres is machined, not fettled on site.

The buildings themselves are mostly 1870s-1890s Victorian villa, Victorian terrace and conservation-area flat conversion. A quote that ignores which one you have is guessing.

Mitred waterfall edge detail on a quartz island
  • 1870s-1890s Victorian villa
  • Victorian terrace
  • conservation-area flat conversion

True everywhere

Worktop fabrication, in short

  • Slabs come in finite sizes, so a long run needs a join.
  • The cut list comes from a template taken in the room, not from a kitchen plan.
  • Where an overhang runs past about 300mm, the support is designed in before cutting starts.
  • Sintered stone is hard on tooling and chips at an edge with nothing under it, so it is cut with more care.
Borough
Lewisham
Postcodes
SE14
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Telegraph Hill is its own job

We would rather tell you what a fit in Telegraph Hill is going to involve now than discover it with a slab in the hallway. Some of the steepest streets in the borough, with houses set high above the pavement behind long flights of steps and railings; conservation-area frontages mean no dropped kerbs and permit-only parking. A dozen steps up from the pavement then a stair inside is the normal profile here, anything over 2.5m needs three people or a joint. None of that is a surprise if somebody has actually looked. That is what the survey is for.

The work

What worktop fabrication involves

Fabrication is the workshop stage. Your template becomes a cut list, the pieces are nested into the slab, and every edge, cut-out and mitre is machined before anything is loaded. Nothing leaves the workshop in stages. The whole kitchen goes out on one van on the fitting day, so a missing piece cannot turn one visit into two. You end up with a fitting day that is mostly carrying and setting, because everything difficult about the job has already happened on a bench in front of somebody.

Fabrication is machine work with a person deciding what the machine does, and the deciding is the part that matters. A bridge saw or a waterjet does the cutting, and which one depends on the shape being cut rather than on the stone. Houses this size usually want an island, and an island is the piece that has to come out of the slab whole. One slab, laid out before a blade touches it.

Waterfall ends See the options

The money

What it costs in Telegraph Hill

The nesting decides the material bill. How the pieces sit on a slab determines whether the job takes one or two, and that is worked before the price is given. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. Material runs from £110 to £550 per square metre supply only, and the template, fabrication and fitting are quoted on their own lines. What the workshop does is on the quote in its own words.

period detached houses and villas

Telegraph Hill in the housing figures

On these streets the inter-war years left little behind, so the familiar bay-and-return plan is rare on these jobs. Joins are placed over a cabinet gable and clear of every cut-out, which the repeated plan makes easy to predict. Machined and polished before it goes near the van.

period detached houses and villas

What Telegraph Hill asks for

A converted flat is measured off the original house, so no two units in the same building have quite the same kitchen run. Pieces are dry-assembled and checked on the bench before anything is loaded. One setout, eight identical tops.

This is the work these streets generate. Worktop replacement follow it.

Access

Getting stone into a Telegraph Hill kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Telegraph Hill is covered on our south east London run, along with the rest of Lewisham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Telegraph Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Telegraph Hill far enough out to be a problem for you?

Yes. Telegraph Hill is on the patch, and the postcodes we work here are SE14. It is worked on our south east London run, along with the rest of Lewisham. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. It rarely changes what we cut, but it does change how the pieces are stacked and strapped for the run out. One movement off the van starts with how it went on. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What should I expect from worktop fabrication in a Telegraph Hill kitchen?

Ceilings are high enough that an extractor over the island has a long drop, and its position is fixed before the island top is templated. Access is off a drive and through wide doors, so for once the piece size is not the constraint - the joins that go in are the ones we choose for layout and veining, not the ones the building forces. The fall across the floor is in the cut list. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. The template drawing carries the real geometry through to the saw, and the piece is machined to it rather than trimmed to it later. Upstands leave the bench in lengths, not as one run.

03

How would you get a worktop into a property in Telegraph Hill?

The measurement that decides everything is the diagonal between the underside of the flight above and the outer edge of the turn below it. So the nesting is worked to the measured route first and to the slab second. The cut list answers to the way in first. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Where unloading has to happen in one go, the load order is planned so nothing has to come off twice. Kerbside unloading is planned in the racking, not improvised at the door.

04

Is Telegraph Hill mostly worktop fabrication work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop replacement. Kitchens go in near the end of a conversion, behind the plastering and the flooring, by which point the programme has already absorbed whatever slipped earlier. So the nesting is planned around it rather than around a standard kitchen. Yield is what makes batching worth doing at all. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. Cutting several kitchens from different slabs and calling them matched is where firms get caught out. Short runs waste more slab than long ones do.

05

What moves the number on a quote around here?

Both runs are in view at the same time, so the two pieces are taken off the same area of slab and the veining is set to run the same way on each side. The nest is laid out around that, with joins placed over cabinet gables and kept clear of every cut-out. Mitres are cut as pairs, off one setting. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What state does a Telegraph Hill kitchen have to be in before you template?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. Internal corners are machined with a radius and polished, and kept well clear of any join or cut-out. Radius first, polish second, joins nowhere near. The range or Aga, the sink and the tap all need to be confirmed by model before nesting, because their clearances and hole positions set where the island can be cut. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. The workshop works from the approved drawing, so whoever signs it off is signing off the join positions too. Whoever holds the budget sees the drawing first.

07

What happens if my units are not level?

A sloping floor is not the problem. The plane the unit tops finish in is. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. The workshop cuts to the plotted line rather than to a nominal dimension, which is why a scribe edge leaves the bench deliberately oversize. A notch and a cut-out never share the same span.

08

Do the template and the fit happen on the same visit?

If the units run late the template moves, not the fit: the gap between them is fabrication. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. Nothing is payable in advance of the template. Solid walls hold their heat and their damp, and anything sealed against them is worth looking at again a season later. All of that is settled at the nesting stage, because a machined piece cannot be adjusted afterwards. The awkward corner is cut first, while the slab is whole.

09

Do you quote Telegraph Hill jobs by the square metre?

Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. Plumbing, gas and electrical work are not in the figure, because we do not do them. The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. It also decides where in the slab the piece is taken from, because a deep relief needs material behind it that a straight edge never asks for. The casing gets plotted. The steel inside it does not.

10

What do you need from me for the sink and hob cut-outs?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. A galley closed at one end takes a short return across the top, and that little piece carries the same edge work, the same handling and nearly the same cost as a full length. A join that lands in the wrong place cannot be moved once the cut-outs are machined, so it is settled on the drawing. The corner is proven on the bench first.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Great work, super helpful team. I'd definitely recommend!”
Andreea TanaseGoogle review
★★★★★
“Great experience from this company, I am happy with the materials, fitting and the team.”
Rrahim BratiGoogle review
★★★★★
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!”
Dawid MyszorGoogle review · Capri White

Next step

Worktop fabrication in Telegraph Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.