Sutton · SM5

Splashbacks and upstands in The Wrythe

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

The Wrythe kitchens

The kitchens we meet in The Wrythe

Before we quote any of the splashback jobs in The Wrythe we want to know what the kitchen actually is, because the answer changes more than the price. Small older cottages and terraces with genuinely tight kitchens, often under 2.4m of usable run once the back door and boiler are in, so the priority is squeezing a dishwasher in and getting a slim breakfast bar rather than an island. Send a few photographs of the run and we will tell you which of those you are dealing with before we come out to The Wrythe.

Where the walls have been dry-lined over the old lath there is a void behind the board and no solid fixing until a batten is found. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. An upstand asks less of old plaster than a panel does.

The staircase rises over the back room in a good number of these, so a sloping bulkhead sits over one end of the run and a piece cannot be stood on edge beneath it. Sockets and switches are cut to measured positions with the faceplates off, not to the positions shown on a drawing. A chimney breast breaks the run and the panels follow it.

Most of what we quote on here is Victorian cottage, Victorian terrace, post-war infill housing and low-rise flats. The age of the shell tells us more than the age of the kitchen does.

Worktop join finished flush against a wall
  • Victorian cottage
  • Victorian terrace
  • post-war infill housing
  • low-rise flats

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Sutton
Postcodes
SM5
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why The Wrythe is its own job

We have carried enough stone into kitchens in The Wrythe to know what to allow for before the day arrives. Narrow lanes with tight bends left over from the old village layout, parking on both sides and front doors opening straight onto the footway. Where a run is under 2.4m we can usually cut it and the upstands from a single offcut, which keeps a small kitchen in real stone instead of pushing the client to laminate. The point of the free visit is that we see the The Wrythe job for ourselves rather than guessing at it from an email.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. Chimney breasts in these kitchens leave a shallow opening where the range once stood, so the strip has to return into it on both sides. One sheet, two seams, nothing to reseal.

Corners and joins See the options

The money

What it costs in The Wrythe

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. Nothing about the £110 to £550 supply range changes once the template is done. What the template settles is the piece count and the operations, and that is where the figure firms up. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

The building, and what it does to the job

A live soil stack cannot be chased back into the wall, so the depth it steals is permanent and the run is planned around it rather than through it. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The sill caps the upstand before anything else does.

Victorian and Edwardian terraces

The Wrythe in the housing figures

Across The Wrythe, most of the stock dates from the building boom of the twenties and thirties. A short run leaves nowhere to hide a join. Where the boiler or the flue sits in one spot house after house, the panel is drawn round it once and reused. Cut to the wall as found.

Victorian and Edwardian terraces

What The Wrythe asks for

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

Access

Getting stone into a The Wrythe kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

The Wrythe is covered on our south London run, along with the rest of Sutton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in The Wrythe

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover The Wrythe?

Yes. The Wrythe is on the patch, and the postcodes we work here are SM5. It is worked on our south London run, along with the rest of Sutton. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Wind on an open street matters more than the walk does. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

Is there anything about The Wrythe buildings that catches worktop splashbacks & upstands out?

A two-up two-down has a kitchen that was never designed to be one, so the run is short, the ceiling is low and every millimetre of depth gets argued over. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Where the plaster undulates, the shorter piece wins. Boxing built in plasterboard on a light frame will take no useful fixing, so nothing bears on it and the stone is carried off the carcasses either side. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A downstand sets the panel height, not the wall units.

03

What do you check about the route into a The Wrythe property?

The front door is often the cheapest hundred millimetres on the route, because a door lifted off its hinges gives back the width its own thickness was taking. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. What can be got into the room decides the height above the worktop. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Standing a panel on the pavement is the last resort.

04

Do The Wrythe kitchens ask for worktop splashbacks & upstands much?

It is one of the three we do most here, behind worktop replacement. Whichever it is, the template and the fitters do not change. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. A repeated spec needs a repeatable splashback. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. One damaged panel, one twin already on the shelf.

05

Why do two The Wrythe kitchens the same size price differently?

Peninsulas frequently land on a lightweight partition or on units that were never fixed down, and stone needs proper support under it before it goes on. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Height is agreed before the cut list closes. Supply-only material is £110 to £550 per square metre, and templating, fabrication and fitting are quoted separately rather than rolled in.

06

What has to be finished before you can template?

A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Behind the boxing it becomes two pieces. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. One staircase can serve an owner on the first floor and a managed tenancy on the second, so the access arrangement changes at every landing while the building stays the same. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.

07

What happens if a piece will not go up the stairs?

The alternative to a join is a shorter run, which is usually the wrong thing to trade away. If a piece cannot be got in at all, we say so at the template rather than on the day. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. An inward-opening door swinging back against the wall leaves less clear opening than the frame measures, and a storm porch in front of it is tighter again. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. They stand upright in the van and stay upright until they are on the wall.

08

Do you check the carcasses before templating in The Wrythe?

If the carcasses are corrected, the template is taken again, since a drawing off units that then moved is worthless. A sloping floor is not the problem. The plane the unit tops finish in is. Units have to be fixed down as well as levelled. A loose carcass moves under stone. Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Nothing gets hidden behind a full-height panel.

09

What is not included in the quoted figure?

Cut-outs, edge profile and join count are itemised, so taking one out removes a line rather than starting an argument. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. The quote is written from the template drawing. Before that it works from what you have described. A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. A mitred external return around it has to come from the same position in the slab, or the pattern visibly steps at the corner. The reveal decides where the stone dies.

10

Is a full-height stone splashback worth doing?

Stone up a wall is heavier than tile and bonded rather than hung, so the wall has to be sound. Socket and switch positions have to be final before templating, because the openings are machined rather than chopped out on the wall. Both are templated after the worktop is down and settled, because they are cut to the wall itself. Cottage terraces have no hall to speak of and the front door opens almost straight into the room, which makes the carry easier and the protection harder. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The tile bed comes off before anything is measured.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Splashbacks and upstands in The Wrythe, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.