The building, and what it does to the job
In this neighbourhood the inter-war years left little behind, so the familiar bay-and-return plan is rare on these jobs. The slow part is the scribe, and it is slow for a reason. Nothing is left for the next trade to finish.
There is a solid base under the old scullery end and suspended timber where the addition meets the house, and the two part company along that joint. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Off in the morning, on by the afternoon.
A knock-through joins two rooms with different ceiling heights and wall finishes, so batch-match the slabs and set your level off the longer span rather than the shorter one.
