Skip to content

Wandsworth · SW11

Worktop installation in Between the Commons

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Between the Commons kitchens

What the kitchens here are actually like

Late Victorian terraceEdwardian terrace

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. The route is walked before the first lift.

This is the densest concentration of side-return and full-width rear extensions in the borough, the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel.

The island is the whole job here, get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. The day is planned backwards from the hall, and the scribing takes longer than the carry. The slow parts are slow for a reason.

What turns up on the job sheets is Late Victorian terrace and Edwardian terrace. Each of those behaves differently once the old top comes off.

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • Every piece is carried in by hand, and stone does not bend.
  • We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
  • Floors and units are protected before anything comes through the door.

Covered on our south west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.

A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. The day is built around that window.

Victorian and Edwardian terraces

What gets asked for here

Second or third on the list around here, after worktop design & quotation. Same visit, same bench, same crew, same lead time.

Access

Getting stone into a Between the Commons kitchen

Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Between the Commons is covered on our south west London run, along with the rest of Wandsworth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop installation in Between the Commons

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in Between the Commons, or just list it?

Yes. Between the Commons is on the patch, and the postcodes we work here are SW11. It is worked on our south west London run, along with the rest of Wandsworth. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. The day is built around that window. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop installation in Between the Commons?

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. The day is planned backwards from the hall, and the scribing takes longer than the carry. The slow parts are slow for a reason. The island is the whole job here, get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.

Is access a problem in Between the Commons?

Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned. A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. The fitting day is planned backwards from that point, before anything comes off the van. It gets checked before the first piece is lifted.

Is worktop installation common in Between the Commons?

It is one of the three we do most here, behind worktop design & quotation. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. Sealed before we leave.

What decides the price of a worktop in Between the Commons?

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Dry-lay first, always. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Eased in, never forced. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. The fitting day is arranged with whoever can actually give us access for the whole slot. Protection goes down first.

Next step

Worktop installation in Between the Commons, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489