The place
Why Chelsea Harbour is its own job
What we plan around in Chelsea Harbour has less to do with the worktop than with getting it through the door and against the wall. Estate management controls the whole site: security barrier at the entrance, visitor and contractor registration, a designated loading bay and a booked goods lift with a fitted protection kit. Almost everything is above ground on a podium over parking, so there is a long level trolley run from the lift lobby to the flat door, and residents' corridors have carpet that needs boarding. Straightforward stone, bureaucratic building - book the goods lift and the bay a week out or you will be standing at the barrier with a full van. Once the template is signed off the price is fixed. It does not move because the job turned out fiddly.

