The place
Why Lots Road is its own job
Most of the work of a fit in Lots Road happens before the van is loaded, in what we have already checked and allowed for. This is a working riverside corner with the creek, boatyards and ongoing construction traffic, so road closures and contractor gate control are routine and worth checking the morning of. New riverside blocks want a booked goods lift and a delivery slot, while the loft conversions often have a wide freight lift left over from the industrial use, which is the easiest access in the whole borough when it is available. If the building kept its old goods lift, use it and stop worrying about piece size - that is rare enough in SW10 to be worth planning the job around. Whatever the building does to a straight line, it is measured on the template and drawn before anything is cut.

