The housing stock
What we are usually working with in Chelsea Harbour
A passive vent or a ducted extract shaft takes a corner of the kitchen from floor to ceiling and cannot be reduced. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. The units are relevelled before anything new is bedded.
Almost everything is above ground on a podium over parking, so there is a long level trolley run from the lift lobby to the flat door, and residents' corridors have carpet that needs boarding. Estate management controls the whole site: security barrier at the entrance, visitor and contractor registration, a designated loading bay and a booked goods lift with a fitted protection kit. Straightforward stone, bureaucratic building - book the goods lift and the bay a week out or you will be standing at the barrier with a full van.
Kitchens are compact and standardised, which makes the fixed template, fabrication and fitting lines a larger share of the total than the stone. Anything that has to be held back goes into concrete with proper anchors rather than into a plug and a hope. Plaster comes away with the old upstands more often than not.
The housing behind these kitchens is late 1980s marina apartment tower, podium-deck apartment block, hotel and serviced residence and design centre and mixed-use building. They are not interchangeable, and a worktop finds the differences quickly.
There is nothing to visit in Chelsea Harbour. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.