City of Westminster · NW8 W2

Splashbacks and upstands in Church Street

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Church Street kitchens

The kitchens we meet in Church Street

Splashback and upstand work in Church Street lives or dies on the awkward detail nobody mentions on the phone, and that detail is almost always something about the room. Flats over the market shops and in the surrounding blocks, with kitchens typically 2.2m to 2.6m of run and appliances chosen to fit rather than chosen first. New regeneration blocks nearby have open-plan kitchens with a compact peninsula and integrated appliances. The point of the visit is that you stop guessing and get a number you can hold us to.

The ceiling is a concrete soffit with a skim on it, so there is nothing to fix into overhead and no void to hide anything in. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. The batch is held while the tops are cut, or the colour drifts.

The floor is a screed over concrete finished in vinyl, hard and flat but rarely level, so the units are packed rather than the stone being cut down to meet them. Dense concrete takes adhesive better than fixings, which actually suits a large bonded panel. Dry lining behind a panel needs a fixing plan of its own.

What we are cutting for, here, is post-war estate block, flat above market shop, Victorian terrace and regeneration new-build. The wall build-up is different in each, and the scribe follows the wall.

Polished stone edge profile close up
  • post-war estate block
  • flat above market shop
  • Victorian terrace
  • regeneration new-build

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
Borough
City of Westminster
Postcodes
NW8, W2
Covered on
our central London run
Fitted
5–10 working days from template

The place

Why Church Street is its own job

Most of the work of a fit in Church Street happens before the van is loaded, in what we have already checked and allowed for. The street market runs most of the week and the stalls occupy the carriageway, so vehicle access is effectively before the market sets up or after it clears. Above-shop flats are reached by a street door between stalls and a steep stair. Market days dictate the schedule here more than anything in the flat does - book the fit for a non-market morning or you will be carrying slabs through stalls. The workshop cuts to the template, not to the kitchen designer's drawing, because only one of those was taken in the room.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a wall that gets wiped down in the same pass as the worktop, because it is the same material carrying on upward rather than a different one starting.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. Every outlet on that wall is recorded at its finished face beforehand, since a machined opening in a sheet of stone has no tolerance to move into. The kitchens are narrow and the cooker nearly always backs onto the party wall, which puts the tallest piece in the tightest part of the room. One sheet, two seams, nothing to reseal.

Edge profiles See the options

The money

What it costs in Church Street

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. Priced by the edge and the openings, not the wall.

ex-local-authority flats and estates

What Church Street asks for

Not typical work for this area. Worktop replacement and worktop installation are what the housing asks for. The process is unchanged; only how often we are on the street differs.

ex-local-authority flats and estates

Church Street in the housing figures

In the streets around Church Street, owner-occupation is well below the London average. The joint to the worktop is siliconed rather than grouted, which matters more in a let property than an owner expects. Cut from the same batch as the surface below.

ex-local-authority flats and estates

The carry, and what it rules out

A market day closes the street to traffic for the morning and hands it back in the afternoon, which moves the visit rather than cancelling it. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. The crate stays on the van until the route in is clear.

Access

Getting stone into a Church Street kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central London patch

Church Street is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Church Street

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Church Street, or is it a subcontractor?

Yes. Church Street is on the patch, and the postcodes we work here are NW8, W2. It is worked on our central London run, along with the rest of Westminster. A timed school street shuts the road either side of the school day, so the van goes in between those two windows or it does not go in. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Distance from tail lift to door is the whole risk here. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

Is there anything about Church Street buildings that catches worktop splashbacks & upstands out?

Windows went in on a programme with plastic frames set into the original openings, so the frame is thicker, the glass area smaller and the reveal has a liner over the concrete. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Old plaster rarely gives you a flat metre. Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Nothing gets hidden behind a full-height panel.

03

What do you check about the route into a Church Street property?

Timber nosings chip under a slipped edge, so the treads are covered along the whole flight rather than only at the landings. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It travels on edge, so the clearance is checked on edge. An event-day suspension can override a bay that is perfectly usable the rest of the week, so a booked space gets checked again nearer the time. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A long carry turns a light piece into an awkward one.

04

Is Church Street really a worktop splashbacks & upstands area?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop replacement and worktop installation. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Full height behind the hob is less for a tenant to scrub. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Grout lines are the first thing to fail in a let.

05

Why do two Church Street kitchens the same size price differently?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Long walls break where the worktop breaks. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What has to be finished before you can template?

Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The reveal decides where the stone dies. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Whoever specifies it signs the drawing.

07

Is taking the old top off part of the job?

What comes out goes by the same route the new stone comes in by, which is why that route is walked before anything is lifted. The template can be taken with the old top still down, which is why one visit covers both. The units are untouched. Only the top of them changes. Where a road is shut for filming or for works the diversion adds distance to the carry even when parking itself was never the problem. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Panels come across in one pass with the route already cleared.

08

Upstands or a full-height splashback?

If it is a decision for later, say so at the template: the match is a question about the batch. What decides between them is usually the wall: what it is built of, how flat it is, and where the sockets ended up. Socket and switch positions have to be final before templating, because the openings are machined rather than chopped out on the wall. The landing serves two or three front doors that open outward onto it, so the space to turn a piece at the top of the flight is not entirely yours to use. That suits a full-height piece, because a large flat panel bonded across its back is more stable on concrete than a run of small tiles ever was. The wall gets made good first or the gap shows.

09

Do you cut drainer grooves on Church Street kitchens?

On a porous stone the grooved area is sealed with the rest, and it gets wet more than anything else. Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. They read strongly across a dark stone and are nearly invisible on a pale one, so look before deciding. Where the kitchen has been opened into the living room the opening was trimmed with a steel, and a stub of the old wall was left standing at one end. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. A return into a reveal is its own scribed piece.

10

What if a worktop will not physically fit through the building?

If a piece cannot be got in at all, we say so at the template rather than on the day. The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. A steep pitch shortens the tread and lengthens the reach, which leaves whoever is below carrying most of the weight for the full flight. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Break positions are chosen for the carry.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Splashbacks and upstands in Church Street, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.