Skip to content

Bromley · BR6

Worktop replacement in Green Street Green

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Green Street Green kitchens

What the kitchens here are actually like

1960s detached1970s link-detached1980s cul-de-sac housingbungalow

Small, roughly square kitchens with a back door and a window in the middle of the run: short lengths, few joins, and a lot to work around. Taking the old tops off is also the first honest look at what has been going on underneath them. Sound carcasses are the one condition.

Post-war detached and link-detached with integral garages, so the kitchen usually backs onto the garage and the utility is a converted garage corner with a second worktop run. Kitchens are moderate size, typically an L plus a peninsula, and clients often want the garage side made into a proper laundry.

Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. The units are often 1970s or 80s and only around 500mm deep, so a standard 600mm stone top overhangs at the front and the doors and drawer fronts need checking against it. What is under the old top is the real question.

The buildings themselves are mostly 1960s detached, 1970s link-detached, 1980s cul-de-sac housing and bungalow. They are not interchangeable, and a worktop finds the differences quickly.

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.

Covered on our south east London run. Fitted 3–7 working days from template.

period detached houses and villas

The building, and what it does to the job

Utility runs in converted garages sit on a different floor level to the kitchen, so we template the two areas as separate jobs even when it is one continuous cabinet line on the drawing.

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day.

period detached houses and villas

Getting stone into the room

Cul-de-sac layouts with turning heads, so the van can get right to the door, but garage-side entrances have a step and a fire door that limits swing.

period detached houses and villas

What gets asked for here

This is one of the three jobs that come up most here, behind worktop installation. It is the same template visit, the same workshop and the same installers either way.

Access

Getting stone into a Green Street Green kitchen

Cul-de-sac layouts with turning heads, so the van can get right to the door, but garage-side entrances have a step and a fire door that limits swing.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south east London patch

Green Street Green is covered on our south east London run, along with the rest of Bromley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop replacement in Green Street Green

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Green Street Green on your patch?

Yes. Green Street Green is on the patch, and the postcodes we work here are BR6. It is worked on our south east London run, along with the rest of Bromley. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The waste run is planned, not improvised. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop replacement in Green Street Green be any different from anywhere else?

Utility runs in converted garages sit on a different floor level to the kitchen, so we template the two areas as separate jobs even when it is one continuous cabinet line on the drawing.

How would you get a worktop into a property in Green Street Green?

Cul-de-sac layouts with turning heads, so the van can get right to the door, but garage-side entrances have a step and a fire door that limits swing. A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. The strip-out is planned around it.

Do you do much worktop replacement around Green Street Green?

It is one of the three we do most here, behind worktop installation. Same template visit, same workshop, same installers either way. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A plumber either side of us. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.

What moves the number on a quote around here?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Green Street Green?

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. This is the commonest reason a replacement turns out to need more than a straight swap. The laminate has been covering it up. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Units kept, surface changed.

Next step

Worktop replacement in Green Street Green, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489