Camden · NW3

Worktop replacement in Hampstead

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Hampstead kitchens

The kitchens we meet in Hampstead

Homeowners tend to arrive at worktop replacement in Hampstead with a picture saved on a phone and no clear sense of what their own kitchen will allow. Two very different jobs sit side by side: listed Georgian townhouses where the kitchen is still in the semi-basement with low ceilings, stone floors and structural piers breaking up every run, and larger detached villas where the kitchen has moved to a rear garden room with a genuine island. Basement runs are short and interrupted by chimney breasts, so the cutting list is long even when the room is not. The survey answers it, the drawing records it, and you sign off the drawing before a single sheet is cut.

Gas, waste and later wiring were boxed in against the wall long after the house was built, and that boxing is what the run has to clear. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. Whatever the old top hid comes to light.

Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. Carcasses are checked for square and fixed back before a stone top goes on them. The floor has dropped since the kitchen went in.

The building stock is Georgian townhouse, Victorian villa, Arts and Crafts house, 1930s modernist block and mansion block. Two of those can sit on the same street and quote a long way apart.

Undermounted sink cut-out in a quartz worktop
  • Georgian townhouse
  • Victorian villa
  • Arts and Crafts house
  • 1930s modernist block
  • mansion block

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Up to four quartz samples are posted free before you commit to a colour.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
Borough
Camden
Postcodes
NW3
Covered on
our central and north London run
Fitted
5–10 working days from template

The place

Why Hampstead is its own job

Templating in Hampstead is as much about the way in and the state of the walls as it is about the measurements. Steep hills, single-track lanes, cobbled and stepped sections that no van gets near, and a CPZ with almost no loading space anywhere near the Village. Lower-ground kitchens are reached down an external area staircase with a tight quarter turn at the bottom, which is normally the narrowest point on the whole job. Listed-building consent shapes what you can fix to a wall, so upstands often replace tiled splashbacks and the area steps dictate slab sizes long before the kitchen layout does. You see the drawing before we cut, and if we have read the room wrong, that is the moment to say so, not the morning the fitters arrive.

The work

What worktop replacement involves

Replacement suits a kitchen that works but has a surface past saving, burnt, swollen at the joints, or lifting where water has found its way into the board underneath. The surface is cleared and the route out protected before anything is unfixed, because a top that has been sealed and screwed down for years leaves the house in pieces with edges on them. You end up with tiling, sealant and the wall line all finished against the new surface, so there is no strip of old grout left showing where the previous top used to sit.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. Brackets, battens and any timber sub-frame come out with the top, and what was screwed into the wall gets filled. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. The old surface leaves in our van, not your garden.

Sink cut-outs See the options

The money

What it costs in Hampstead

Most of the cost sits in the same places as a new fit (the cut list and the day) with the strip-out added and the units taken away. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Multiplying your worktop area by something between £110 and £550 gives you a material bill rather than a job cost, and the two are far enough apart to be worth keeping separate. What is found underneath is raised before it is charged.

period detached houses and villas

What Hampstead asks for

The research on this patch does not put this among the three commonest jobs. Worktop installation do. That changes how often we are here, not how the work is done.

period detached houses and villas

The shape of the run

A waterfall leg is a separate piece bonded to the top on a mitre, so the floor it stands on has to be level enough for that mitre to close along its full height. Cut-outs in the new tops rarely land exactly where the old ones did, so the sink and hob are checked against the new sizes rather than assumed to carry across. The new pieces are nested, not traced off the old ones.

period detached houses and villas

Hampstead in the housing figures

In this corner of the borough, houses are the minority and blocks are the norm. Every survey starts from a blank sheet. The old tops have to leave the way the new ones arrive, and a laminate run is easier to remove whole than to carry whole. What is behind the old top is checked, not assumed.

Access

Getting stone into a Hampstead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central and north London patch

Hampstead is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hampstead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Hampstead on your patch?

Yes. Hampstead is on the patch, and the postcodes we work here are NW3. It is worked on our central and north London run, along with the rest of Camden. A bay suspension carries a fee and a notice period, and the notice period is the part that catches people out when a date moves. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old tops out and new stone in, both through the same gap. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

Does the housing in Hampstead change how worktop replacement works?

Listing and conservation conditions apply to a good number of these, which constrains what can be altered around the kitchen rather than what goes on top of the units. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Whatever the shell has done since is dealt with now. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Levels get corrected before the new top is measured.

03

How does the stone actually reach a kitchen in Hampstead?

Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. It decides whether the old top leaves whole. Some zones are controlled for a short window in the middle of the day and open either side of it, which makes the timing of the visit the whole question. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The waste run is planned, not improvised.

04

Is worktop replacement what Hampstead is known for?

No, not particularly, and it would be easy to say otherwise. What the research on this patch actually lists is worktop installation. That is the local housing talking rather than anything about the job. It is priced, cut and fitted no differently here than anywhere else we cover. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A builder-finish kitchen upgrades in a morning. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The carcasses have to be sound, because stone is several times the weight of what is coming off. The doors are staying, so the colour answers to them.

05

What am I actually paying for, line by line?

It is the heaviest single piece in the kitchen, so the number of hands needed on the day and the route in are worked out from that piece rather than from the runs. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The sink is chosen before the cut list is set. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

Is there anything I have to finish before the template in Hampstead?

Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. We would rather find it at template than on the morning, which is why the templater looks behind the units. Same footprint, different tolerances. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Replacement suits occupied stock better than a strip-out.

07

Will you fit stone onto units that are not level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. A sloping floor is not the problem. The plane the unit tops finish in is. Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The sill was always low. Nobody had to care until now.

08

How much upkeep is a stone worktop?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. A basement kitchen has a flagged or concrete floor laid straight onto the ground, so it is solid, cold and rarely within ten millimetres of level. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Plaster comes away with the old upstands more often than not.

09

How do you cut out for an undermounted sink?

A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. Whether it comes off the same slab as the run behind it or needs one of its own is settled by laying both against the usable area of the slab, not by adding the metres up. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Joins move onto the gables this time round.

10

What if the stairs turn too tightly for the stone?

A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. Hoisting through a window is occasionally the answer, and it is a decision made at the template, not improvised on the fitting day. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. Every flight adds a set of handling movements, and handling is where stone gets damaged, so a fourth-floor walk-up is priced by the flight rather than by the metre. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Both movements are planned as one.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Worktop replacement in Hampstead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.