The housing stock
What we are usually working with in Hampstead
Ceilings are generous and the rooms are narrow, so the runs are long, the aisle is tight and there is nowhere to stand a slab on edge. The fitting day is planned backwards from all of it, before the first piece comes off the van. Old plaster gets scribed to, never fought with.
Basement runs are short and interrupted by chimney breasts, so the cutting list is long even when the room is not.
Steep hills, single-track lanes, cobbled and stepped sections that no van gets near, and a CPZ with almost no loading space anywhere near the Village. Listed-building consent shapes what you can fix to a wall, so upstands often replace tiled splashbacks and the area steps dictate slab sizes long before the kitchen layout does. Two very different jobs sit side by side: listed Georgian townhouses where the kitchen is still in the semi-basement with low ceilings, stone floors and structural piers breaking up every run, and larger detached villas where the kitchen has moved to a rear garden room with a genuine island.
Original panelling and shutter boxes stand out from the structural wall, so the face the units meet is joinery rather than plaster. The day is planned backwards from the hall. The shell has the last word on fitting day.
The housing here takes in Georgian townhouse, Victorian villa, Arts and Crafts house, 1930s modernist block and mansion block. The age of the shell tells us more than the age of the kitchen does.
Quartz and stone worktops in Hampstead