Havering · RM3

Splashbacks and upstands in Noak Hill

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

Noak Hill kitchens

The kitchens we meet in Noak Hill

Getting splashback and upstand work in Noak Hill right is mostly a matter of knowing what you are dealing with before the order goes in, and that means looking properly. The rural northern fringe, with a small amount of estate housing giving way to cottages, smallholdings and one-off houses. Kitchens tend to be large but irregular, often incorporating a utility and boot room in the same space, with a freestanding range and long timber-or-stone runs against thick walls. If your kitchen is a bit of both, that is common enough and it changes nothing about how we go about it.

Deep skirtings, a dado and a picture rail survive in the original rooms, so nothing sits flat to the wall without being cut around first. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The batch is held while the tops are cut, or the colour drifts.

Lime plaster over rubble moves in and out enough that a single long panel will show a gap somewhere along its length. Long runs mean more than one piece, and the joint belongs in a corner or on a hob centre line rather than mid-run. Height, returns and sockets, all settled on site.

What we are usually templating in is rural cottage, 1950s estate housing, scattered detached and smallholding. They were built to different tolerances, and the stone has to absorb that.

Worktop join finished flush against a wall
  • rural cottage
  • 1950s estate housing
  • scattered detached
  • smallholding

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Havering
Postcodes
RM3
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Noak Hill is its own job

A worktop is made to fit one kitchen, and in Noak Hill the kitchen and the way into it are what we work from. Country lanes with no restrictions and generous private hardstanding, though verges are soft and there is nowhere sensible to turn a large van on some stretches. Oil boilers and range flues take up wall space out here, so we survey what is actually fixed to the wall before agreeing a run length. Our own installers do the fitting, so whoever templated the room is not handing the problem over to a subcontractor.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. The height is settled first, since a slim upstand and a full sheet up to the wall units are different pieces of work and the wall between them is where the decision shows. You end up with a joint that stays closed. It is siliconed rather than filled hard, so the wall and the surface can move against each other without opening a crack.

A full-height sheet must live with everything already on that wall, the extractor and its bracket included, because it is machined to fit round them and cannot be eased afterwards. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. A room this size usually has a range standing in a chimney opening, and the piece behind it is a separate taller one that sits within the brick jambs. One sheet, two seams, nothing to reseal.

Corners and joins See the options

The money

What it costs in Noak Hill

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

Noak Hill in the housing figures

On these streets the bulk of the housing belongs to the rebuilding decades after the war. The front door is rarely the binding constraint. Socket and switch positions have to be final before the panel is templated. Height agreed before anything is cut.

Victorian and Edwardian terraces

What Noak Hill asks for

Access is arranged through a managing agent or a scheme office rather than with the household directly, so a date gets confirmed once in writing and moving it costs a fortnight. Full-height panels need the wall made good first, which is another trade and another timescale. Committed early or dropped early, not left open.

Around here this is occasional rather than routine. The routine ones are worktop installation and worktop fabrication. That is a comment on the buildings and on nothing else.

Access

Getting stone into a Noak Hill kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Noak Hill is covered on our east London run, along with the rest of Havering.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Noak Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Noak Hill, or just list it?

Yes. Noak Hill is on the patch, and the postcodes we work here are RM3. It is worked on our east London run, along with the rest of Havering. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. These travel flat and get carried on edge, and both want room. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

Why would worktop splashbacks & upstands in Noak Hill be any different from anywhere else?

A range or an Aga in an original recess is usually immovable, so the run is designed around it and the clearances come from the appliance. These runs are long and often include a range recess, so the splashback is nearly always more than one piece and the joint placement matters, put it in a corner or over a hob centre line, not randomly in the middle of a clear run. A hundred millimetres covers more than it looks. A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail.

03

What is the carry like in Noak Hill?

The tail lift is still the pinch point, because the piece has to be walked off it onto the trolley while it is sitting at chest height. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Full height goes in only where the way in allows full height. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Where the van has to move, the panels come in first.

04

Is worktop splashbacks & upstands what Noak Hill is known for?

Not really, and claiming otherwise would cost nothing and mean nothing. What the research on this patch actually lists is worktop installation and worktop fabrication. It reflects the local housing rather than any difference in the work. It is quoted, cut and fitted here the same way it is anywhere else on the patch. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Cut with the tops while the batch is open. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Cut as a set, so one can replace another.

05

Where does the money go on a Noak Hill worktop?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Return ends are polished, not left sawn. Supply-only material is £110 to £550 per square metre, and templating, fabrication and fitting are quoted separately rather than rolled in.

06

What needs to be ready before you come to Noak Hill?

Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed, dubbed out, or set proud. Pick one. The range and extractor must be sited and the window cill finished before the template, as both fix the vertical limits of the splashback. Where the provider has set the specification the material choice was made once for a great many kitchens, and the useful work is meeting it exactly rather than proposing something else on the day. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The tops and the wall are rarely one approval.

07

Do you take the old worktop away?

If you want the old top kept for a garage or a utility, say so and it stays on site. Old tops are screwed or glued from underneath, so the drawer boxes come out before the worktop does. The units stay where they are and only the surface changes. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. A panel carried past a live lane gets a second pair of hands.

08

Do you cut drainer grooves on Noak Hill kitchens?

The alternative stands on the surface, so the choice is losing worktop permanently or only while you are draining. Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. The room has three or four doors and a route through it to the garden, so the work shares the space with everyone else in the house. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. A return into a reveal is its own scribed piece.

09

What happens when the route into a Noak Hill kitchen is tighter than the worktop?

If a piece cannot be got in at all, we say so at the template rather than on the day. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. The alternative to a join is a shorter run, which is usually the wrong thing to trade away. Suction lifters need a clean dry face to hold, so in the wet the pads come off and the piece goes back to being carried on webbing by hand. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Upstands make almost any turn a worktop will not.

10

Is one material less trouble than another for a Noak Hill kitchen?

Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Topping a seal up is a wipe-on job with a cloth. Ceiling beams cross the room at a height that decides where a piece can be stood on edge and where it cannot. Granite or sintered stone goes behind a range rather than quartz, because a resin binder does not enjoy sustained radiant heat. The plaster behind it is the real question.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review

Next step

Splashbacks and upstands in Noak Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.