Kingston upon Thames · KT4

Splashbacks and upstands in Old Malden

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Old Malden kitchens

The kitchens we meet in Old Malden

Homeowners tend to arrive at splashback and upstand work in Old Malden with a picture saved on a phone and no clear sense of what their own kitchen will allow. Older cottages around the church with tiny kitchens under 2.4m of run, and interwar semis on the surrounding roads that mostly get a rear extension across the full width giving a 4m run with an island of 1.8m to 2.1m and bifolds onto the garden. A worktop that fits is a worktop that was measured. The description is background, the template is the actual instruction.

The window over the sink sits at about worktop height, so the run is set out around the sill and the reveal rather than under them. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. Old walls take a scribed upstand better than a rigid panel.

The kitchen sits on the far side of the hall from the front door, so even with easy access outside there is still a turn to make inside. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. The wall gets made good first or the gap shows.

On this patch the buildings are Victorian cottage, 1930s semi, 1930s detached and postwar infill. They were built to different tolerances, and the stone has to absorb that.

Worktop join finished flush against a wall
  • Victorian cottage
  • 1930s semi
  • 1930s detached
  • postwar infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Kingston upon Thames
Postcodes
KT4
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Old Malden is its own job

What we look for on a survey in Old Malden is the sort of thing that never appears on a kitchen plan. The area drops towards the Hogsmill, so several roads are on a noticeable slope with sunken driveways; otherwise off-street parking is the norm and side passages are wide enough for a trolley. Sloping plots mean the extension floor and the original floor rarely match, so worktop heights get set from the units, never from the finished floor. We template Old Malden kitchens after the units are in and levelled, which is the only point at which the real measurements exist.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

A full-height sheet must live with everything already on that wall, the extractor and its bracket included, because it is machined to fit round them and cannot be eased afterwards. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. These kitchens were pushed into the side return at some point, and the seam between original brickwork and newer plaster falls exactly where a tall sheet wants to sit. Machined to the room, not trimmed to it.

Corners and joins See the options

The money

What it costs in Old Malden

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. The catalogue starts at £110 per square metre at the plainest end and reaches £550 at the top, supply only, with the same fabrication work sitting behind either choice. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

The carry, and what it rules out

A drive behind an electric gate depends on somebody being in to open it and on the gate staying open while the load comes off. Where the carry is long the panels come in on edge, two hands on them and nothing else in the way. Rushing the last piece off the van is how panels break.

Victorian and Edwardian terraces

What Old Malden asks for

Not typical work for this area. Worktop installation are what the housing asks for. The process is unchanged; only how often we are on the street differs.

Victorian and Edwardian terraces

Old Malden in the housing figures

Around here bay-fronted inter-war housing sets the pattern. Socket and switch positions have to be final before the panel is templated. Measured off the fitted top, not the drawing.

Access

Getting stone into an Old Malden kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Old Malden is covered on our south west London run, along with the rest of Kingston upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Old Malden

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Old Malden, or just list it?

Yes. Old Malden is on the patch, and the postcodes we work here are KT4. It is worked on our south west London run, along with the rest of Kingston upon Thames. Some drives are wide enough for the van and too short for the tail lift, because the tail lift needs its own clear metre behind the vehicle. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Two hands and a clear route, or it waits on the van. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

Why would worktop splashbacks & upstands in Old Malden be any different from anywhere else?

These were built with a separate dining room, and most have had the wall between it and the kitchen taken out with a steel put in above. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Solid plaster on brick takes a panel; a hollow wall wants thought. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Full height wants a flat wall behind it.

03

What is the carry like in Old Malden?

Where the garden is level and the back door is wide the pieces get staged outside on trestles and brought in one at a time as the fitters are ready for them. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A tall panel cannot be tilted to clear a turn, so it is sized not to need to. Where the drive falls away from the house the trolley wants to run, and where it climbs the same load has to be pushed the whole way up. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. The longer the walk, the fewer the panels per trip.

04

Would you call Old Malden a worktop splashbacks & upstands area?

Not really, and claiming otherwise would cost nothing and mean nothing. What the research on this patch actually lists is worktop installation. It reflects the local housing rather than any difference in the work. It is quoted, cut and fitted here the same way it is anywhere else on the patch. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The offcuts finish the room. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Less to clean, for whoever cleans it.

05

Where does the money go on an Old Malden worktop?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Vein direction carries up from the top below. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

06

What needs to be ready before you come to Old Malden?

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Each obstruction is another joint, and it is priced as one. The old tiling must be off and the wall made good and dry before templating, not on fitting day. A quartz sample left on the counter for a week under the actual kitchen lights settles more arguments than any showroom, and an owner is the only person in a position to do that. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. A deferred splashback still comes off this drawing.

07

What happens to the worktop that comes off?

Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. The units stay where they are and only the surface changes. A visitor or a neighbour parked on the drive is a five-minute problem at eight in the morning and an hour-long one at eleven. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. A narrow gap between parked cars decides how a panel turns.

08

What if the units in an Old Malden kitchen have moved since they went in?

Level is checked at the template, which is the point of measuring in the room rather than off a drawing. Units have to be fixed down as well as levelled. A loose carcass moves under stone. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The panel takes its height off the steel.

09

What is the order of events on an Old Malden kitchen?

The template produces a drawing, and the workshop cuts to that drawing once you agree it. The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. No money changes hands before the template. The old larder leaves behind a thick cold shelf and a vent brick through the outer wall, and both have to go before that wall reads flat. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Twenty millimetres of packing behind a panel is not a fix.

10

Why would an Old Malden kitchen need a join at all?

An island often runs in one piece where a wall run cannot. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. A finished join is typically two to three millimetres, colour-matched and sanded flush. The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Behind an island there is no wall to hide against.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is very practical for everyday use. Highly recommend Worktop Worx for anyone looking for quality quartz worktops.”
RO74 TVXGoogle review · Calacatta Gold
★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review

Next step

Splashbacks and upstands in Old Malden, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.