Southwark · SE15

Worktop replacement in Peckham

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Peckham kitchens

The kitchens we meet in Peckham

Worktop replacement in Peckham is not one job repeated, because the kitchens here are not one kind of kitchen. The Bellenden-side Victorian terraces are extension country - kitchen moved into a rear infill with a 3m run against the flank and a small island or peninsula - while the estate flats and warehouse-style conversions to the north stay galley-shaped with a single run and a tall bank. Book the design and quotation visit, and someone will be at your Peckham address with a tape, the colour range and no obligation attached.

The rear wall of the addition carries both the back door and the window, which leaves very little unbroken wall for a run to sit against. A kitchen that has stood twenty years has settled into a shape of its own, and the new stone is cut to that shape rather than the original one. Water damage under a sink is the usual find.

Kitchens in these flats are frequently in what was a bedroom or a return room, so the window is tall and its sill sits close to worktop height. The old top ran under the tiles, so taking it out brings the bottom course with it and the upstand covers what is left. Sound carcasses are the one condition.

The stock we template in here is Georgian terrace pockets, Victorian bay-front terrace, 1960s and 1970s estate and 2010s conversion of light industrial. The one you have sets the piece length before the kitchen does.

Undermounted sink cut-out in a quartz worktop
  • Georgian terrace pockets
  • Victorian bay-front terrace
  • 1960s and 1970s estate
  • 2010s conversion of light industrial

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Southwark
Postcodes
SE15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Peckham is its own job

A firm that has not worked in Peckham tends to find out about the access on the morning of the fit, which is too late to change anything. Tight terraced streets with permit bays, a lot of skips and builders' vans competing for kerb, and rear access rarely usable because gardens back onto other gardens rather than a lane. Half these jobs land mid-build with the extension still drying out, so template late and check the plaster is on before you cut. We sort it out with a template, then the quote says what sorting it out costs.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. Whatever sits on top of the old surface, tiling, an upstand or a run of sealant, has to be dealt with in the same visit, so it is priced with the job rather than left as a surprise. You end up with cut-outs machined for the sink and hob you have now, which is not always what the old top was cut for, and a run that meets the wall as it stands today.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. The wall behind the old splashback is made good and left flat before the new piece is templated against it. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. You keep the kitchen; only the top is new.

Sink cut-outs See the options

The money

What it costs in Peckham

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. No surprises pulled out from under the old top.

period detached houses and villas

The shape of the run

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Height change is checked before we cut.

period detached houses and villas

What Peckham asks for

Not typical work for this area. Worktop installation are what the housing asks for. The process is unchanged; only how often we are on the street differs.

period detached houses and villas

Peckham in the housing figures

In this corner of the borough, the bands run low by London standards. The plans vary house by house. A plumber disconnects before we arrive and reconnects after we have gone. Services isolated before anything is lifted.

Access

Getting stone into a Peckham kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Peckham is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Peckham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Peckham far enough out to be a problem for you?

Yes. Peckham is on the patch, and the postcodes we work here are SE15. It is worked on our south east London run, along with the rest of Southwark. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. A timed bay does not cover a strip-out and a fit. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop replacement in a Peckham kitchen?

A conversion takes kitchen waste to a stack added to the outside of the building, which fixes the sink position long before anyone draws a layout. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. The old top hid it; the new one will not. A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. It was there long before we were.

03

How would you get a worktop into a property in Peckham?

Grass and gravel will not take a loaded trolley, so a boarded track gets laid from the gate to the door before the first piece moves. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The route is protected once and then used four times. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old stone is heavier going out than it looked coming in.

04

Is worktop replacement what Peckham is known for?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Four kitchens ordered together take one template visit and one delivery, and that is where the saving comes from rather than from a discount on the stone. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A deposit deduction rarely covers a new top. Rooms in a shared house are let individually, so the work has to be done around whoever is still living in the building. The carcasses have to be sound, because stone is several times the weight of what is coming off. Four flats, four days, no scaffold week.

05

What moves the number on a quote around here?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Same shape, different cut list. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

What state does a Peckham kitchen have to be in before you template?

Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. We would rather find it at template than on the morning, which is why the templater looks behind the units. The old top hid it. The drawing will not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Method statements, insurance certificates and named operatives are wanted before a crew is cleared to attend, all of which is routine when it is asked for a week out. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Two visits mean two people taking a day off.

07

What if the base units are out of level?

A sloping floor is not the problem. The plane the unit tops finish in is. Levelling belongs in the carcasses, on their own legs and packers. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. Nothing about it is a discovery on fitting day.

08

Does a stone worktop need sealing?

No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Topping a seal up is a wipe-on job with a cloth. Floors are the original joists with a later acoustic layer laid over them, and that layer is not flat where it meets the doorways. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Same units, straighter line, better surface.

09

What is actually on a Peckham worktop quote?

The edge profile is its own line, so a shaped edge and a square one are two different figures. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. No installed price per square metre is published, because it is not a real number. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. The laminate was scribed thin. Stone cannot be.

10

Can the sink be undermounted rather than sat on top?

A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The old cut-outs prove nothing.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5”
Kam 98Google review
★★★★★
“We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer any questions. The new worktops have completely transformed our kitchen and look amazing. Highly recommend Worktop WorX to anyone looking for high quality kitchen worktops, bespoke workmanship, and excellent customer service.”
Gabriel TivadarGoogle review · Laurent Gold sintered stone
★★★★★
“Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The countertops look fantastic, and he even went above and beyond, using leftover quartz to create an extra counter in my bathroom. Genius. He’s kind, professional, reasonably priced, and just gets on with it. No fuss, no drama, just a job very well done. I wouldn’t hesitate to recommend him and will absolutely be using him again if the need arises. Happy to answer any questions.”
Susie WigginsGoogle review

Next step

Worktop replacement in Peckham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.