Camden · NW1 NW3

Splashbacks and upstands in Primrose Hill

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Primrose Hill kitchens

The kitchens we meet in Primrose Hill

Customers looking at splashback and upstand work in Primrose Hill usually want to know two things first: what it will cost and what has to come out to make room for it. Tall narrow houses where the kitchen sits at garden level at the back of the lower ground, one room deep, so you are working to a 3-4m single run with a small return and rarely an island. The stucco terraces have shallow rear extensions rather than full-width returns, so the room stays long and thin no matter what the designer draws. Nothing is payable until the template is taken, so finding out where you stand costs you nothing at all.

Party wall settlement pulls the floor down at one side of the room, so a long run reads level at one end and not at the other. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. Sockets cut in the shop, not on site.

Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Cut from the same slab run as the tops.

On these streets the housing is early Victorian stucco terrace, Regency terrace, conversion flat and mews. The wall build-up is different in each, and the scribe follows the wall.

Polished stone edge profile close up
  • early Victorian stucco terrace
  • Regency terrace
  • conversion flat
  • mews

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Camden
Postcodes
NW1, NW3
Covered on
our central and north London run
Fitted
5–10 working days from template

The place

Why Primrose Hill is its own job

The work we do in Primrose Hill has taught us which details to write down at the survey and which to allow extra for. Permit-only bays, waiting restrictions along most of the crescent frontages, and houses set behind railings with a bridge to the raised front door and a separate area stair down to the kitchen. Everything goes down those area steps under the front bridge, through a railing gate that is frequently under a metre wide. The area-stair route caps slab size long before the kitchen does, so plan joins around what will physically pass the railing gate rather than around the sink position. The awkward conversation belongs at your kitchen table at the quote stage, not over a half-fitted worktop.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. Any return around a reveal or a boxed pipe is machined as part of the same piece, not butted on later from a second offcut. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. Stone behind the hob, not grout.

Edge profiles See the options

The money

What it costs in Primrose Hill

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. For a rough sense of the material, £110 to £550 per square metre supply only is the honest span. Treat it as one line of a quote that will carry several more. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

What Primrose Hill asks for

This one is uncommon here and there is no advantage in pretending otherwise. Worktop installation come up far more often. Quoting, fabrication and fitting are identical either way.

Victorian and Edwardian terraces

The carry, and what it rules out

The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A narrow gap between parked cars decides how a panel turns.

Victorian and Edwardian terraces

Primrose Hill in the housing figures

Locally the inter-war semi is not the local type, so the rear-addition return that defines those houses is uncommon. The same wall build-up comes up again and again, so what works on one holds for the next. Scribed where the wall bows rather than packed out.

Access

Getting stone into a Primrose Hill kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central and north London patch

Primrose Hill is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Primrose Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Primrose Hill?

Yes. Primrose Hill is on the patch, and the postcodes we work here are NW1, NW3. It is worked on our central and north London run, along with the rest of Camden. A single red line has hours and a double red line does not, and the difference decides whether an early start is a plan or a penalty. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. These travel flat and get carried on edge, and both want room. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about Primrose Hill buildings that catches worktop splashbacks & upstands out?

Walls are thick, lime-plastered and built in a soft brick, so they take a scribe well and take a fixing badly. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Decided before fabrication starts. Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Mitred returns come from one place in the slab.

03

What do you check about the route into a Primrose Hill property?

A meter cupboard set into the hall wall narrows the run at exactly the height a carried piece travels. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Suction lifters take a panel where hands cannot get a grip. Where a marked loading box sits on the red route the stop is legal but timed, so the unload runs as one movement with every hand on it. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Where the van has to move, the panels come in first.

04

Do you get much worktop splashbacks & upstands work in Primrose Hill?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop installation. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Panels for every unit, cut in one go. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. A spare panel is cheaper now than next year.

05

Why do two Primrose Hill kitchens the same size price differently?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Behind an island there is no wall to hide against. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What has to be finished before you can template?

Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The pier takes a joint against it, not across it. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Two flats with an identical layout can want entirely different things from the same run of worktop, which is why the quote follows the run rather than the address. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. What repeats across flats is recorded once and repeated.

07

Is taking the old top off part of the job?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. If you want the old top kept for a garage or a utility, say so and it stays on site. Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. A panel carried past a live lane gets a second pair of hands.

08

What if a worktop will not physically fit through the building?

The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. If a piece cannot be got in at all, we say so at the template rather than on the day. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. Whether the kitchen sits straight ahead or off a turn at the end of the hall changes the maximum piece far more than the hall width does. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Nothing is leaned anywhere it could slide down.

09

Is templating a separate visit from fitting?

The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. Nothing is measured until the sink, the tap and the hob are in the room to measure against. The same firm templates and fits. Nobody else is brought in to install. Gas, waste and later wiring were boxed in against the wall long after the house was built, and that boxing is what the run has to clear. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Height off the units, not off the old tiles.

10

The floor in my Primrose Hill kitchen slopes. Does that matter?

Where a run meets an appliance, level decides whether that appliance door still clears the stone above it. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Level is checked at the template, which is the point of measuring in the room rather than off a drawing. A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A window board below worktop height ends the upstand argument.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Splashbacks and upstands in Primrose Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.