The housing stock
What we are usually working with in Bankside
The kitchen is usually part of the living space, so three edges are read from a sofa rather than from standing height at the sink. Pieces are cut, mitred, machined and dry-assembled on the bench before anything is loaded onto a van. Cut to the room, not to a rectangle.
Waterfall ends and mitred edges mean the fabrication tolerances matter more than the fitting: 1mm out on the mitre shows on a 900mm drop. High-spec apartment kitchens, usually a German handleless system with a full-height tall bank, a long island with mitred waterfall ends, and a preference for large-format porcelain or Dekton at 12mm to 20mm rather than heavy stone.
These flats are built with a floating floor over a concrete slab for acoustic reasons, and it deflects slightly under the weight of a stone island. Socket cut-outs in a full-height panel are machined to measured back-box positions rather than to the developer layout. Cut-outs are placed where the fabric will take them.
The housing here takes in 1990s riverside apartment, 2000s glass tower and converted industrial building. What the units are screwed to varies between them, and that decides the fixings.
Access. Riverside towers with a single loading bay, booked service lift, protective floor coverings demanded by building management, and no kerbside anywhere near the entrance.
Building management is often the real gate rather than the bay itself, since the barrier, the shutter and the lift each need someone with a fob. It rarely changes what we cut, but it does change how the pieces are stacked and strapped for the run out. Straps and battens are chosen for lifting, not just for transit.
Quartz and stone worktops in Bankside