Southwark · SE1

Splashbacks and upstands in Bankside

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

Bankside kitchens

The kitchens we meet in Bankside

Most of the questions we get about splashback jobs in Bankside are really questions about the kitchen itself, which is where any sensible answer has to start. High-spec apartment kitchens, usually a German handleless system with a full-height tall bank, a long island with mitred waterfall ends, and a preference for large-format porcelain or Dekton at 12mm to 20mm rather than heavy stone. Nothing is payable until the template is taken, so finding out where you stand costs you nothing at all.

Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. The flatter the wall, the taller the stone.

These buildings have firm rules about what can be propped open, left in a lobby or carried through the residents entrance. Where the run passes a boxed stack the panel breaks into returns, and each return gets a mitred external corner. The plaster behind it is the real question.

On this patch the buildings are 1990s riverside apartment, 2000s glass tower and converted industrial building. They fail in different places, which is why the survey looks at different things.

Worktop join finished flush against a wall
  • 1990s riverside apartment
  • 2000s glass tower
  • converted industrial building

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
Borough
Southwark
Postcodes
SE1
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Bankside is its own job

The questions we ask about a job in Bankside are about the route, the doorways and the walls, not about the finish. Riverside towers with a single loading bay, booked service lift, protective floor coverings demanded by building management, and no kerbside anywhere near the entrance. Waterfall ends and mitred edges mean the fabrication tolerances matter more than the fitting - a 1mm out on the mitre shows on a 900mm drop. The awkward conversation belongs at your kitchen table at the quote stage, not over a half-fitted worktop.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. The hob is usually a small induction unit on a stud partition, which makes a tall sheet a question of wiping down rather than of heat. Cut from the slab the worktop came out of.

Corners and joins See the options

The money

What it costs in Bankside

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. If you are holding two quotes, the £110 to £550 supply rate is the part they will agree on. Compare the join count, the edge profile and what the fitting line covers. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

Bankside in the housing figures

In the streets around Bankside, converted and purpose-built flats make up most of the stock. Upstands travel in short lengths and get in almost anywhere, which is part of why they are specified. Returns and reveals set out at finished size.

Victorian and Edwardian terraces

The carry, and what it rules out

Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Panels come across in one pass with the route already cleared.

Victorian and Edwardian terraces

What Bankside asks for

The stock here does not generate much of this. What it generates is worktop fabrication and worktop installation. The job itself is surveyed, quoted and fitted exactly as it would be anywhere else we work.

Access

Getting stone into a Bankside kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Bankside is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Bankside

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Bankside, or just list it?

Yes. Bankside is on the patch, and the postcodes we work here are SE1. It is worked on our south east London run, along with the rest of Southwark. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A short bay slot is when the tall pieces get damaged. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

What is different about worktop splashbacks & upstands in Bankside?

The kitchen usually sits along the internal spine of the plan with the glazing at the far end, so the run itself has no window and no daylight on it. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. A bowed wall is what decides between an upstand and a panel. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Upstands sit tight because both edges are cut.

03

Is access a problem in Bankside?

Car depth is the number that settles it wherever a piece cannot be stood upright, and most residential cars are shallower than the run they are serving. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Panels are carried on edge from the tail lift to the wall. The goods lift has its own booking sheet, and a bay slot without a lift slot only gets the stone as far as the lobby. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Kerb to kitchen is measured before the panels are unstrapped.

04

Is Bankside really a worktop splashbacks & upstands area?

Not really, and claiming otherwise would cost nothing and mean nothing. What the research on this patch actually lists is worktop fabrication and worktop installation. It reflects the local housing rather than any difference in the work. It is quoted, cut and fitted here the same way it is anywhere else on the patch. New-build kitchens are usually smaller than the plan suggests once the appliances are in, so the usable run is shorter than the drawn run. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Reordered next year, it will not match. Buyers upgrading before handover work to a choices deadline set by the sales office rather than by the build programme. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Full height behind the hob is less for a tenant to scrub.

05

What makes one Bankside kitchen dearer than the next?

A hob cut-out and the floor penetration feeding it have to land over the same cabinet, and where they do not it is the stone that gets redrawn rather than the pipework. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Tall panels are what push a job into a second slab. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What holds a template up more often than anything else?

Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A breast return is scribed on three edges. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. Full-height panels need the wall made good first, which is another trade and another timescale. Plastering finishes on somebody else’s timescale.

07

Do you cut drainer grooves on Bankside kitchens?

Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. On a porous stone the grooved area is sealed with the rest, and it gets wet more than anything else. The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Sockets cut in the shop, not on site.

08

What happens when the route into a Bankside kitchen is tighter than the worktop?

A join added to get stone into the room is a different thing from a join added because the slab ran out, and the quote says which is which. The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. A car ceiling at 2.2m sets the tallest thing that will stand in it, and the trap panel and light fitting take a slice off even that. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. The frame they travel in needs the clearance as well.

09

Is templating a separate visit from fitting?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. No money changes hands before the template. Developer carcasses are thin cam-lock chipboard, which is entirely adequate under laminate and wants bracing before stone. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Height off the units, not off the old tiles.

10

What happens if a worktop is damaged getting into a Bankside property?

Damage found on the bench never leaves the workshop, and damage on the carry is remade under the same cover. Our own installers do the carry, so there is nobody in the middle to argue with about it. Chips at an edge or a corner are the usual form, because that is where stone is least supported. A goods lift booked by the hour puts a clock on the whole delivery, so pieces go up in a planned order and nothing is handled twice. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. A vertical break is easier to live with than a cracked panel.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review

Next step

Splashbacks and upstands in Bankside, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.