Merton · SW20

Splashbacks and upstands in Bushey Mead

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Bushey Mead kitchens

The kitchens we meet in Bushey Mead

Before we quote any of the splashback jobs in Bushey Mead we want to know what the kitchen actually is, because the answer changes more than the price. Uniform interwar semis with rear kitchens that owners typically extend by two or three metres to create a kitchen-diner, keeping cabinetry on one wall and putting a dining table where the garden door used to be. Compact islands of around 1.8m appear where the extension is wide enough. You do not need to know which one you have before you call. We work that out on the survey.

These were built with a coal store and an outside lavatory off the back, and where those got absorbed into the kitchen the walls around them are thinner and later. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The flatter the wall, the taller the stone.

These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. Behind a hob the panel runs to the underside of the extractor, and that height is settled on site rather than on the plan. Where the plaster undulates, the shorter piece wins.

The stock we template in here is 1930s semi, Interwar terrace and 1970s infill house. The one you have sets the piece length before the kitchen does.

Undermounted sink cut-out in a quartz worktop
  • 1930s semi
  • Interwar terrace
  • 1970s infill house

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
Borough
Merton
Postcodes
SW20
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Bushey Mead is its own job

We have carried enough stone into kitchens in Bushey Mead to know what to allow for before the day arrives. Wide residential roads with no controlled parking make this one of the easier areas for van access in the borough. The limiting factor is usually the side alley between semis, which narrows at the gate post. Because the houses are near-identical, sizes repeat, but never assume it, the extension depths vary by a metre either way between neighbours. You see the drawing before we cut, and if we have read the room wrong, that is the moment to say so, not the morning the fitters arrive.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Openings in a tall sheet are given a radiused internal corner rather than a square one, because a sharp internal corner in thin material is where a crack begins. These kitchens were pushed into the side return at some point, and the seam between original brickwork and newer plaster falls exactly where a tall sheet wants to sit. One sheet, two seams, nothing to reseal.

Sink cut-outs See the options

The money

What it costs in Bushey Mead

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Thickness on its own can move the supply figure a long way inside the £110 to £550 range, and it changes the machining as well, which is why the two are never given as one number. The cut-outs are counted, not estimated.

1930s and inter-war semis

The shape of the run

Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. Where the run carries a join, the panel behind it is broken in the same place, so the two seams line up instead of sitting a hand-width apart. Height is agreed before the cut list closes.

1930s and inter-war semis

The carry, and what it rules out

Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. Kerb to kitchen is measured before the panels are unstrapped.

1930s and inter-war semis

What Bushey Mead asks for

The research on this patch does not put this among the three commonest jobs. Worktop installation and worktop replacement do. That changes how often we are here, not how the work is done.

Access

Getting stone into a Bushey Mead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Bushey Mead is covered on our south west London run, along with the rest of Merton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Bushey Mead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Which postcodes do you cover around Bushey Mead?

Yes. Bushey Mead is on the patch, and the postcodes we work here are SW20. It is worked on our south west London run, along with the rest of Merton. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Wind on an open street matters more than the walk does. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

What should I expect from worktop splashbacks & upstands in a Bushey Mead kitchen?

The original kitchen was a small rear room with a larder and a back door, and nearly all of them have since been opened into the dining room. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. The tile bed comes off before anything is measured. Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The sill caps the upstand before anything else does.

03

How would you get a worktop into a property in Bushey Mead?

A side gate and a back door mean the stone never goes through the house at all, which keeps the dust and most of the risk outside. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Suction lifters take a panel where hands cannot get a grip. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Standing a panel on the pavement is the last resort.

04

Does Bushey Mead actually ask for worktop splashbacks & upstands?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation and worktop replacement. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. A spare panel is cheaper now than next year. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Reordered next year, it will not match.

05

What moves the number on a quote around here?

Knee room under a breakfast bar is measured from the face of the cabinets rather than from the edge of the stone, so a deep apron quietly eats the depth somebody actually gets to sit in. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What state does a Bushey Mead kitchen have to be in before you template?

Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A downstand sets the panel height, not the wall units. The old tiling must be off and the wall made good and dry before templating, not on fitting day. A quartz sample left on the counter for a week under the actual kitchen lights settles more arguments than any showroom, and an owner is the only person in a position to do that. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Two attendances need two people to be in.

07

When do I pay for a Bushey Mead worktop?

Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. No installed price per square metre is published, because it is not a real number. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Behind the boxing it becomes two pieces.

08

What do drainer grooves add to the job?

Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. The extension slab was poured to its own level, so there is a lip or a ramp where the new floor meets the original one. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Sockets cut in the shop, not on site.

09

What happens if my units are not level?

An island is where this usually shows, standing free with no wall to level against. A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Levelling belongs in the carcasses, on their own legs and packers. Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. A mitred external return around it has to come from the same position in the slab, or the pattern visibly steps at the corner. Nothing gets hidden behind a full-height panel.

10

Do the template and the fit happen on the same visit?

The design and quotation visit comes first. It is free and carries no obligation. Between the template and the fit the slab is nested, cut, mitred and dry-assembled on the bench, which is work you never see and is most of the wait. Money does not move until the template is done. Rear extensions on these sit on shallow foundations, and the crack at the junction with the original wall tells you which way it has moved. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Height off the units, not off the old tiles.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Splashbacks and upstands in Bushey Mead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.