Lewisham · SE12

Worktop replacement in Lee

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Lee kitchens

The kitchens we meet in Lee

The reason worktop replacement in Lee is quoted per kitchen rather than per metre comes down to the range of rooms these worktops end up in. The Lee Green and Lee High Road terraces have the standard back-addition kitchen, but the streets toward Manor House have larger detached and semi-detached houses where the kitchen has usually been extended into the garden for a 4m run plus island. Side returns are the common project. The point of the visit is that you stop guessing and get a number you can hold us to.

Ground floors fall away towards the garden across the whole footprint, so the units are packed up long before anything is measured for stone. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The old top comes off in pieces, not whole.

Where the addition is single storey the ceiling follows a lean-to roof, so one side of the room loses height and a full-height panel has a sloping stop. The old top ran under the tiles, so taking it out brings the bottom course with it and the upstand covers what is left. Off in the morning, on by the afternoon.

Most of what we quote on here is Victorian terrace, large Victorian villa, 1930s semi and postwar infill. Each of those behaves differently once the old top comes off.

Worktop join finished flush against a wall
  • Victorian terrace
  • large Victorian villa
  • 1930s semi
  • postwar infill

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Lewisham
Postcodes
SE12
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Lee is its own job

The questions we ask about a job in Lee are about the route, the doorways and the walls, not about the finish. Mixed, terraced roads are permit-parked and narrow, the villa streets have off-street parking and wide gates, and the South Circular makes stopping anywhere near Lee Green awkward. Side-return extensions here often leave a long unsupported run past a bifold opening, confirm there's a support leg or return before cutting. We put it in writing at the quote, and the workmanship is guaranteed for five years after we have fitted it.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The template and the fit are separate visits with three to seven working days between them, so the kitchen is only out of action on the day the old surface comes off. You end up with the same kitchen and a completely different surface, in one fitting day rather than a kitchen refit that empties the room for a fortnight.

Replacement is the job where the tiling, the sink and the wall behind them all get settled at the same time as the worktop. Laminate lifts light and long, so the difficulty is turning a three-metre length in a small room rather than carrying its weight. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. Nothing is taken apart that does not have to be.

Corners and joins See the options

The money

What it costs in Lee

Most of the cost sits in the same places as a new fit (the cut list and the day) with the strip-out added and the units taken away. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. You keep the units, and you see what that saves.

Victorian and Edwardian terraces

The shape of the run

Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. Cut-outs in the new tops rarely land exactly where the old ones did, so the sink and hob are checked against the new sizes rather than assumed to carry across. Yield is worked out fresh for the new material.

Victorian and Edwardian terraces

What Lee asks for

This one is uncommon here and there is no advantage in pretending otherwise. Worktop installation come up far more often. Quoting, fabrication and fitting are identical either way.

Victorian and Edwardian terraces

Lee in the housing figures

On these streets hardly any of it is newly built, so what the old surface was fixed to matters more than what goes on top. A heavier surface may need the cabinets braced, which is settled once the old laminate is lifted. Any fall in the carcasses is packed out first.

Access

Getting stone into a Lee kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Lee is covered on our south east London run, along with the rest of Lewisham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Lee

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Lee?

Yes. Lee is on the patch, and the postcodes we work here are SE12. It is worked on our south east London run, along with the rest of Lewisham. A suspension is charged by the bay and by the day, so the number of metres asked for is worth getting right the first time. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. It is a full day at the kerb, not a delivery. You never have to visit anything or collect anything: we template in your kitchen and fit in your kitchen.

02

Is there anything about Lee buildings that catches worktop replacement out?

Original quarry tiles survive under a later vinyl in many of these, and lifting the units off them shows how far the floor has fallen towards the garden end. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. The old top hid it; the new one will not. A window board sitting below finished worktop height leaves two choices, drop the top under it or notch the stone around it, and both cost more than a straight run. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. A postformed top swallowed the fall. This will not.

03

What do you check about the route into a Lee property?

Garden routes carry their own hazards: a drain cover, a step up to a patio, wet decking, or a lawn that will not take a loaded trolley. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. A laminate run comes out easier than stone goes in. Plenty of zones run at the weekend as well as through the week, so a Saturday date is not automatically the easier one to work. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Two loads, one space, one day.

04

Do you get much worktop replacement work in Lee?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop installation. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. No sealing schedule for anybody to forget. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Old tops out in the morning, new stone down and sealed the same afternoon. The annexe top goes in on the same day.

05

Why do two Lee kitchens the same size price differently?

Knee room under a breakfast bar is measured from the face of the cabinets rather than from the edge of the stone, so a deep apron quietly eats the depth somebody actually gets to sit in. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. A run that flexed under laminate gets support now. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What has to be finished before you can template?

A cill projecting forward of the plaster line pushes the back edge out, and the units then stand off the wall by that amount for the whole length. This is the commonest reason a replacement turns out to need more than a straight swap. The alcove was never square and it still is not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The surface changes and the kitchen stays the one they know.

07

Is templating a separate visit from fitting?

The template produces a drawing, and the workshop cuts to that drawing once you agree it. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. The same firm templates and fits. Nobody else is brought in to install. The back addition is frequently a single skin of brick rendered on both faces, which takes a fixing badly and moves with the weather. Taking the old tops off is also the first honest look at what has been going on underneath them. Laminate hides a level that stone will not.

08

Is taking the old top off part of the job?

Disposal means it goes in the van, not into the garden to wait for a collection. An old stone top is heavier coming out than the new one is going in, and leaves in sections. The sink and hob are lifted out with the old top and kept aside if you are reusing them. A permit covering the street is permission to park rather than a space reserved on it, and on a full street the difference is the whole morning. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. The old tops have to go somewhere as well.

09

What if a worktop will not physically fit through the building?

Where there is a lift, whether it can be booked out and padded matters as much as its size. The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. A side gate hung to open outward against a fence post is narrower in use than it measures, and lifting the gate off its hinges is usually the quickest win on the route. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Old pieces are carried out before new ones are carried in.

10

Will you fit a worktop I have bought myself?

The workmanship guarantee is the same either way. It does not extend to a material we did not supply. How the slab has been stored is worth telling us, because stone kept flat is not stone off a rack. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. A surface swap is the fastest upgrade available on a kitchen that is otherwise sound. Booked at short notice, because the notice is short.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is very practical for everyday use. Highly recommend Worktop Worx for anyone looking for quality quartz worktops.”
RO74 TVXGoogle review · Calacatta Gold
★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review

Next step

Worktop replacement in Lee, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.