Skip to content

City of London · EC3R

Worktop replacement in Monument

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Monument kitchens

What the kitchens here are actually like

upper-floor flat in a Victorian commercial buildingmodern apartment over retailnarrow lane building conversionpostwar block with residential floors

Old plaster built up over decades makes the scribing heavy, and that time has to be in the plan rather than found on the day. Taking the old tops off is also the first honest look at what has been going on underneath them. Sound carcasses are the one condition.

The flats here are small city apartments in converted upper floors, and kitchens are typically an L of 2.4-3m with a compact appliance run, often opening straight into the living space.

Because the buildings are narrow and deep, the kitchen usually has no window and sits against an internal wall, so a stone splashback and a matching windowsill-height upstand is the standard finish. The lanes running down toward the river between Eastcheap and Lower Thames Street are narrow, one-way and steeply graded in places, and several are pedestrian-only during the working day. The gradient on the lanes down to the river means a loaded trolley will run away from you - chock it or carry it, do not push it downhill.

External walls are thick and the run under the window sits in a deep reveal that has to be templated rather than assumed square. The lift car is usually too short and too low to take a full-length piece flat or on edge, so stone either goes up the communal stairs with their half-landings and winders, or the run is designed with joins that suit the staircase rather than the kitchen. What is under the old top is the real question.

The buildings themselves are mostly upper-floor flat in a Victorian commercial building, modern apartment over retail, narrow lane building conversion and postwar block with residential floors. A quote that ignores which one you have is guessing.

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.

Covered on our the City run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Building entrances are often a single street door with a straight stair to the upper floors, no lift, and no room at all to set a slab down while you rest.

A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. The strip-out is planned around it.

Victorian and Edwardian terraces

What gets asked for here

The research on this patch puts this at the top of the list, above worktop splashbacks & upstands and worktop templating.

Access

Getting stone into a Monument kitchen

The lanes running down toward the river between Eastcheap and Lower Thames Street are narrow, one-way and steeply graded in places, and several are pedestrian-only during the working day. Building entrances are often a single street door with a straight stair to the upper floors, no lift, and no room at all to set a slab down while you rest.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

the City patch

Monument is covered on our the City run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop replacement in Monument

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Monument?

Yes. Monument is on the patch, and the postcodes we work here are EC3R. It is worked on our the City run, along with the rest of the Square Mile. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste run is planned, not improvised. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Monument change how worktop replacement works?

External walls are thick and the run under the window sits in a deep reveal that has to be templated rather than assumed square. The lift car is usually too short and too low to take a full-length piece flat or on edge, so stone either goes up the communal stairs with their half-landings and winders, or the run is designed with joins that suit the staircase rather than the kitchen. Sound carcasses are the one condition. The gradient on the lanes down to the river means a loaded trolley will run away from you - chock it or carry it, do not push it downhill.

How does the stone actually reach a kitchen in Monument?

The lanes running down toward the river between Eastcheap and Lower Thames Street are narrow, one-way and steeply graded in places, and several are pedestrian-only during the working day. Building entrances are often a single street door with a straight stair to the upper floors, no lift, and no room at all to set a slab down while you rest. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. It sets what the day actually looks like.

Is Monument mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands and worktop templating. Landlord work is scheduled around void periods, so the whole thing is a fixed window and the template date matters as much as the fitting date. Old tops out in the morning, new stone down and sealed the same afternoon. A day, not a project. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project.

Why do two Monument kitchens the same size price differently?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate has been covering it up. Get the managing agent's or freeholder's approval and the permitted hours confirmed beforehand, and agree with the porter who protects the communal carpet, stonework and lift. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Units kept, surface changed.

Next step

Worktop replacement in Monument, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489