The housing stock
What we are usually working with in Pitshanger
These kitchens have usually been retiled twice and knocked through once, and both of those leave marks the worktop has to deal with. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. The last piece down is the one nearest the door.
The Pitshanger Lane parade has limited bays but the residential roads have drives. The golf course and the River Brent cut off through routes, so it is one way in and back out. Larder and pantry shelving in matching stone gets asked for here, so cut it from the offcut at the same template rather than reordering later.
The incoming main and the stopcock come up through the floor at the old scullery wall, so whatever unit stands over them has to stay removable. Where a return wraps into a recess, the piece is offered in dry, marked and eased rather than pushed. Levelled first, then set, then sealed.
The fabric of the place is 1930s semi, interwar detached, Edwardian house near the lane and postwar infill. Knowing which one it is before we arrive is half the survey done.
There is nothing to visit in Pitshanger. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.