Skip to content

Newham · E16

Worktop templating in Custom House

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

Custom House kitchens

What the kitchens here are actually like

interwar terracepost-war council housingrecent regeneration apartment

These kitchens have usually been retiled twice and knocked through once, and both of those leave marks the worktop has to deal with. No stone is ever cut from a plan, which is why the visit happens after the units are in and not before. Sink, tap and hob on site, not on order.

Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat.

Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.

The back door frequently opens straight into the kitchen, which is the best carry route in the house and the one people forget to mention. Where the room has been knocked through to the dining room or opened into a later extension, the two floors rarely sit at the same level and the laser has to be shot across the whole opening from one datum. Recorded as it is, not as it was drawn.

On these streets the housing is interwar terrace, post-war council housing and recent regeneration apartment. The differences between them show up at template, not at enquiry.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered from the Essex patch. Fitted 3–7 working days from template.

1930s and inter-war semis

Getting stone into the room

Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. A templater circling for a space arrives late into a slot that was already tight, and the drawing is what suffers. The templater needs a proper stop, not a pause.

1930s and inter-war semis

What gets asked for here

This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.

Access

Getting stone into a Custom House kitchen

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Custom House is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Custom House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Custom House?

Yes. Custom House is on the patch, and the postcodes we work here are E16. It is run from the Essex side, covering Essex & East London. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. A templater circling for a space arrives late into a slot that was already tight, and the drawing is what suffers. It goes on the job sheet for the fitting crew. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Custom House change how worktop templating works?

An inter-war terrace is wider than a Victorian one and shallower than a semi, so the kitchen is a compact square room rather than a galley. Where the room has been knocked through to the dining room or opened into a later extension, the two floors rarely sit at the same level and the laser has to be shot across the whole opening from one datum. No stone is ever cut from a plan. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.

How does the stone actually reach a kitchen in Custom House?

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. That is part of what the visit is for. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop templating common in Custom House?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Two to three hours on site, with the sink, tap and hob physically present. Appliances on site, not on order. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Two to three hours on site, with the sink, tap and hob physically present. The room as it is, not as it was drawn.

Why do two Custom House kitchens the same size price differently?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Join positions and vein direction are marked on the template drawing before it leaves site. The drawing leaves site complete. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Plotted, not estimated. All base units in, including anything standing on the later extension slab, walls skimmed to final thickness, and the sink, tap and hob delivered so cut-outs and tap centres are set from the actual items. Managed stock usually comes with its own rules about working hours, waste, and who is allowed on site. A template booked hopefully around another trade is the commonest cause of a wasted visit. No stone is cut from a plan.

Next step

Worktop templating in Custom House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398