The building, and what it does to the job
Around here much of what is standing is recent build. The schedule matters more than the finish. A heavier surface may need the cabinets braced, which is settled once the old laminate is lifted. No gap in the kitchen overnight.
Ceiling heights are held to the minimum the plan allows, so the panel between worktop and wall units is a short piece. Communal areas are protected from the entrance to the flat door, because the building notices a mark long before the client does. Old fabric gets handled as old fabric.
The knock-through peninsula across an old serving arch is typical of the housing here, and the arch reveal needs an exact template rather than a stated dimension.







