Skip to content

Newham · E6

Worktops in Cyprus

The surface itself: which stone, what it costs by the square metre, and what the room does to that number.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Cyprus kitchens

The kitchens we meet in Cyprus

1980s-90s low-rise estaterecent campus-adjacent apartmentsmall new-build terrace

There is no single answer to what stone worktop supply and fitting in Cyprus costs, and the honest version of that answer starts with the kind of kitchen involved. Low-rise flats and small houses with kitchens of 2m to 2.6m along one wall, some opened into the living room with a short breakfast bar. There is a strong rental element, so specifications favour hard-wearing surfaces and simple square edges over elaborate detailing. If that sounds like guesswork, it is not: it is measured on the day, in your kitchen, before anything is cut.

Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. Run lengths are what turn a rate per square metre into a bill, since a slab is bought whole and the part of it nobody uses is paid for all the same. The light in a room shortens the shortlist faster than the budget does.

Access is a question about the plot rather than the house: a narrow frontage between older buildings with nowhere obvious to stand a van. The surface is on show from the living space, so it is furniture as much as work surface, and a quiet consistent stone carries that double duty better. Save on the colour before you save on the thickness.

What turns up on the job sheets is 1980s-90s low-rise estate, recent campus-adjacent apartment and small new-build terrace. What the units are screwed to varies between them, and that decides the fixings.

True everywhere

Worktops, in short

  • Supply is £110 to £550 per square metre across the 181 surfaces we fit.
  • Four free quartz samples are posted out, because photographs of stone lie.
  • The material is guaranteed 25 years and the workmanship 5.
  • Quartz runs £130 to £500 per square metre, granite £121 to £550 and Dekton £110 to £366.
Borough
Newham
Postcodes
E6
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Cyprus is its own job

What we look for on a survey in Cyprus is the sort of thing that never appears on a kitchen plan. Quiet residential roads with off-street bays and level thresholds, plus DLR viaducts that force a few detours but no serious restriction. Ground and first-floor flats dominate, so most work involves a short carry and a single flight at most. Rental turnover drives the timing here, so jobs get booked around a tenancy change date and the template-to-fit gap has to be short. Every one of those is a question we ask on the design visit, long before anybody talks about a deposit.

The work

What worktops involves

Worktop supply and fitting covers the stone itself, machined to your room: the surface, the polished edges, the openings for sink, hob and tap, and the fitting of the finished pieces. Where a slab is being reserved for you, it can be seen whole before it is cut, which is the only reliable way to judge movement across three metres of stone. You keep the offcut if you want it, which is where the chopping board, the shelf and the spare piece for a future repair come from.

Across the 181 surfaces fitted, supply is £110 to £550 per square metre: quartz £130 to £500, granite £121 to £550, Dekton £110 to £366. Upstands are cut to whatever height the cill permits, usually a shallow band, while a splash return behind a hob is a separate piece carrying its own polished top edge. The worktop is visible from the sofa, so it is chosen as part of the room rather than as equipment hidden behind a door. Sampled at home, templated in the room, machined once.

Worktop join finished flush against a wall
Corners and joinsSee the options

The money

What it costs in Cyprus

Material band is the single largest lever on the total, and moving up a band on a small kitchen costs less than most people assume because there is little area to multiply. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Supply is £110 to £550 per square metre, and it is the least interesting line on the quote, because the operations listed underneath it are what separate one job from another. Finished edges are counted by the metre, not by the surface.

ex-local-authority flats and estates

Cyprus in the housing figures

Across this patch recent development accounts for much of what is standing. Let property is specified for durability and turnaround. Rear extensions are where islands appear, and the island is what turns one slab into two on the quotation. Tight spaces can afford an expensive material; sprawling ones frequently cannot.

ex-local-authority flats and estates

The carry, and what it rules out

A shared drive is only useful if the neighbour is not the one parked behind the van, so we ask which side the standing belongs to before the date is set. Resin for the joints is mixed to the stone on the day, and matching a heavily figured slab takes longer at the bench than matching a plain one ever does. A figured slab takes longer to match than a plain one.

ex-local-authority flats and estates

What Cyprus asks for

It would be overstating it to call this a speciality on this patch. Worktop replacement, worktop installation and worktop splashbacks & upstands are far commoner. None of that changes the survey, the cut list or the fit.

Access

Getting stone into a Cyprus kitchen

Quiet residential roads with off-street bays and level thresholds, plus DLR viaducts that force a few detours but no serious restriction. Ground and first-floor flats dominate, so most work involves a short carry and a single flight at most.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

east London patch

Cyprus is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Cyprus

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Are you set up to work in Cyprus, or is it a subcontractor?

Yes. Cyprus is on the patch, and the postcodes we work here are E6. It is worked on our east London run, along with the rest of Newham. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. Whatever the standing allows, the stone leaves that van finished, because every edge, cut-out and internal radius is machined at the works and none of it is open to reconsideration at the kerb. Stone is delivered machined, sealed and covered, in that order. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

What is different about worktops in Cyprus?

Block and beam floors with blockwork walls are true enough that the scribes are light and the joins can be pulled tight. Kitchens in these blocks are compact and open to the living space, so the surface is furniture as much as work surface and a quiet consistent stone carries that better than a dramatic one. Two slabs change the question from price to preference. An unsupported overhang off a stud wall wants noggins fixed between the studs before the boarding goes on, and once it is boarded and skimmed that option has gone. Every notch and every scribe is machined into the piece before it leaves the works, and a hard sintered surface is the least forgiving of a tight internal corner, so one is always cut with a generous radius. A short upstand shows a fragment of pattern, never a run of it.

Is access a problem in Cyprus?

Carrying down a flight is not the easier direction, because the weight runs ahead of the crew and whoever is at the bottom has no way of stopping a slip. That caps the longest piece, and a run split into two lengths nests differently on the slab, which moves the yield and moves the figure with it. Vein direction is settled before the slab is broken into pieces. Where the drive is too short for the van the back end overhangs the footway, and a footway is a route people are using rather than spare space. A granite kitchen ends its day with a sealer, and a sealer wants a dry face and a quiet hour afterwards, so that hour is written into the day rather than borrowed from it. The face is uncovered once, and that once is at handover.

Does Cyprus actually ask for worktops?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop replacement, worktop installation and worktop splashbacks & upstands. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. Where several kitchens are ordered together the sensible move is to take them all off one batch, because two slabs of the same name bought six months apart will not sit happily in the same building. The island is usually what turns one slab into two. Agents book this work at short notice, because the void only becomes a real date once the outgoing tenant confirms they are going. Volume work tends to live at the entry end of the range, and the entry end is genuine stone rather than a compromise, since the lowest supply figure we quote is a sintered surface and not a thin laminate pretending to be one. Where tenants change often, a surface with nothing to seal wins.

What makes one Cyprus kitchen dearer than the next?

The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. A shape like that nests kindly on a slab, so more of what gets bought ends up on the units and the rate per square metre behaves much as the brochure says it will. A pale honed face earns its keep in a room short of daylight. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

What holds a template up more often than anything else?

Stud centres are almost never where the brackets would like to be, so fixing positions get set from the framing and the stone is designed to suit. A hob dropped into the middle of a length puts sustained warmth at the lip of a cut-out, and an engineered surface will yellow there across ten years where a natural one takes it without comment. Reach across an unsupported span is a thickness question. Send the kitchen layout with run lengths and the peninsula projection if there is one, and tell us what the lift will take as a single piece. Work between tenancies runs against a fixed date rather than a preference, and stone has a lead time that has to fit inside that window with a few days spare. That changes which questions are worth asking about the stone, because somebody staying put wants to know how a honed face marks in five years and somebody selling wants to know how it photographs next spring. Whoever holds the keys later is the one who needs the paperwork.

What is the order of events on a Cyprus kitchen?

The template produces a drawing, and the workshop cuts to that drawing once you agree it. The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. Which stone belongs on top of all that is a separate question from the building itself, and it is the one with a figure attached, because supply alone runs from £110 to £550 per square metre before a single cut has been made. The cheapest stone and the dearest one share a fitting day.

Is taking the old top off part of the job?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. An old stone top is heavier coming out than the new one is going in, and leaves in sections. The units below stay exactly as they are; only the surface is replaced. Having the van on the drive means the load can be staged, so the heavy pieces come off last and go straight in instead of standing outside. Sintered surfaces are the hardest of the three to machine and the messiest to cut wet, which is precisely why none of that happens on a public pavement. Stone arrives finished, because a kerb is not a polishing shop.

What if the units in a Cyprus kitchen have moved since they went in?

Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. An island is where this usually shows, standing free with no wall to level against. A partition that gives when you lean on it will give under someone sitting at an overhang, and a bonded mitre nearby is where that movement shows first. A deep scribe eats into the back of the piece, which is quietly important on a stone with directional figure, since the pattern moves backwards as that depth comes off. Speckle hides the resin line a mitre leaves behind.

Do you cut drainer grooves on Cyprus kitchens?

A groove set needs a clear stretch of worktop beside the bowl, so it competes with the run for length instead of being free surface. Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. Developer carcasses are thin cam-lock chipboard, which is entirely adequate under laminate and wants bracing before stone. The surface is where the money actually moves: across the 181 kitchens fitted the median is £220 per square metre, and half of them land between £165 and £300. Priced by the square metre, lived with by the square inch.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌

Costin Roman

Google review

Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5

Kam 98

Google review

We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer any questions. The new worktops have completely transformed our kitchen and look amazing. Highly recommend Worktop WorX to anyone looking for high quality kitchen worktops, bespoke workmanship, and excellent customer service.

Gabriel Tivadar

Google review · Laurent Gold sintered stone

Next step

Worktops in Cyprus, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489