The building, and what it does to the job
Across this patch a large share of the housing went up between the wars. The awkward moment is nearly always the same one on this plan, so it is dealt with early. Fitted to the survey, checked against the room.
The original kitchen was a small rear room with a larder and a back door, and nearly all of them have since been opened into the dining room. Where a return wraps into a recess, the piece is offered in dry, marked and eased rather than pushed. The slow parts are slow for a reason.
Islands out here are often sited over a raised floor slab in the new extension, so we check the finished floor level and unit height against the rest of the kitchen before templating.







