The building, and what it does to the job
A radiator sits under the rear window on the outside wall, and moving it is plumbing that belongs before the template rather than after it. What catches people out is the junction between the old floor and the extension floor, which is rarely at the same level, so a run carrying across it needs the units packed before stone goes on. Old tops were scribed to a wall that has moved since.
Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. Sealant is not a way of fitting it, so the scribe is cut until it closes and the silicone only has to seal. Offered up twice, bonded once.







